140 likes | 621 Views
Installation: the plan. Reality. Pressure dome: the problem. The Rack, Mark I. Scan Head, in place, finally. 144Z AMS Configuration. Pressure Vessel “Doghouse”. Equipment Racks -. Cable Run. AMS Mosaic 3/1/13. Magna, UT. Kennecott Smelter. Kennecott Stack 3/1/13. Kennecott Stack.
E N D
144Z AMS Configuration Pressure Vessel “Doghouse” Equipment Racks - Cable Run
AMS Mosaic 3/1/13 Magna, UT Kennecott Smelter
Kennecott Stack 3/1/13 Kennecott Stack
DRAFT West Valley City, UT 3/1/13 RSAC
AirCell Issues • Leaver Arm Measurements for Applinix • Installed electronics into IPM box • Integrate IPM and conduct ground tests • Reconfigure AirCell for static IP and reset router • Connect IPM to AirCell and AMS • Test Ground Processing Software Connection
Wasatch Front 3/29/13 -112.245 42.069 7,5,3 7.6m
Utah Lake 3/29/13 • Imagery will be evaluated by USGS for hot spring monitoring project