What is likelihood that vendor will take back spent fuel and high level waste in the future? It would make implementatio

Group D4 - Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planning QUESTIONS / DIFFICULTIES

Ava
Download Presentation

What is likelihood that vendor will take back spent fuel and high level waste in the future? It would make implementatio

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group D4 - Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planningQUESTIONS / DIFFICULTIES • What is likelihood that vendor will take back spent fuel and high level waste in the future? It would make implementation of nuclear power much easier. • Once I choose a particular reactor type am I bound to a single fuel supplier? Countries would like a choice between suppliers to ensure reliable reasonable cost supply. • Which should countries decide on first: a fuel strategy or a particular design TM/WSP 5-9 Nov. 2007

  2. Group D4 - Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planningQUESTIONS / DIFFICULTIES • Does the agency have specific numerical guidance for the key siting criteria, eg volume of water available etc. Some guidance on high level criteria for initial site screening and whether it is better to look for multi unit sites would be valuable. • What type of siting studies need to be done at the furthest out zone? TM/WSP 5-9 Nov. 2007

  3. Group D4 - Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planningQUESTIONS / DIFFICULTIES • Who should be responsible for carrying out radiation and environmental monitoring during both normal operation of the power plant and during emergencies. • How should the coordination between the monitoring of different agencies, regulators and the power plant staff be carried out. TM/WSP 5-9 Nov. 2007

  4. Group D4 - Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planningQUESTIONS / DIFFICULTIES • Who should be in charge of emergency response? • Some countries have a general crisis centre and a specific centre for managing nuclear or radiation emergency response. Is it possible to give guidance on when the responsibility should move from one to the other? • Who should be responsible for training in emergency response? • What are the mechanisms for assessing the quality of emergency response plans? • Will there be guidance on which of the latest designs require less off-site emergency planning? TM/WSP 5-9 Nov. 2007