Innovative Process Equipment and Installation Systems

BMI has provided engineering and installation services for Innovative Process Equipment and Installation Systems for multiple projects and developed long-term collaborative relationships with their customers. We are creating a system that will allow you to grow in the future. <br><br>To know more visit our site.<br>https://barnummechanical.com/featured-projects/<br>

Download Presentation

Innovative Process Equipment and Installation Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Innovative Process Equipment and Installation Systems

  2. Coca-Cola North AmericaAmerican Canyon, CA Automated beverage production facility • Designed, engineered, and installed process support utilities. • Reconfigured steam distribution and condensate return. • Designed and installed stand-alone chilled glycol system.

  3. J. J. Pfister Distilling CompanySacramento, CA New organic distillery • Designed, engineered, and installed new organic distilling production system, process piping, utilities, and equipment, including steam and condensate supply and return, glycol distribution, compressed air distribution, and filtered process water • Designed, installed, and commissioned controls instrumentation for temperature control of mash, fermentation, and distilling processes

  4. Bently Heritage Estate DistilleryMinden, NV Showcase distillery BMI assisted with various process and utility piping projects during the initial installation phase of the project. BMI has remained on-site as the primary process contractor for all Bently’s process and utility piping modifications, process improvements, and startup support.

  5. Deschutes BreweryBend, OR eading-edge brewery • On-site project management and installation crews for glycol distribution system, utilizing new innovative Georg Fischer COOL-FIT piping for glycol distribution on new fermentation tanks • Engineered, fabricated, and installed automated mixproof valve matrix for wort transfer and CIP, enabling simultaneous cleaning and process transfers

  6. We design, fabricate and install • Contact: (800) 922-7686 • 3260 Penryn Road, Loomis, California 95650 • www.barnummechanical.com