70 likes | 672 Views
NGB Target Strength vs. Actual Assigned Strength. 5320. NGB Goal for FY 07 . NGB Target Strength Goal for FY 06. NGB Goal for FY 2005. Good. NGB Target Goal was 4137 for FY 2003, 4400 for FY 2004, 4550 for FY 2005, 4700 for FY 06 and 5000 for FY 07.
E N D
NGB Target Strength vs. Actual Assigned Strength 5320 NGB Goal for FY 07 NGB Target Strength Goal for FY 06 NGB Goal for FY 2005 Good NGB Target Goal was 4137 for FY 2003, 4400 for FY 2004, 4550 for FY 2005, 4700 for FY 06 and 5000 for FY 07.
Army National GuardFuture Additions to Force Structure FY08 Military Police Battalion HQ Military Police Company 1971st Contingency Contracting Team FY09 Engineer Battalion Engineer Sapper Company Fire Fighting Team FY10-11 Combat Support Brigade HQ Brigade Support Battalion (includes HQ, Maintenance Co, Truck Co, Network Team) Signal Company Fire Fighting Team Military Intelligence Company
Army National GuardMobilization 259th Security Force 170 640th Aviation Maintenance 23 1-285th Aviation Battalion 427 158th Infantry Battalion 582 Embedded Team Trainers 15 362 Explosive Ordnance Detachment 24 Individual Mobilizations 27 Total Number of AZ ARNG Currently Deployed: 1,295 4,461 Soldiers have deployed to date Army Force Generation (ARFORGEN) model has 14 units (929 Soldiers) in FY-09 a/o 25SEP07
Air National Guard • PERSONNEL: 2479 • CURRENT UNITS: • 161st Air Refueling Wing • 162nd Fighter Wing: Tucson, AZ • 107th Air Control Squadron • 111th Space Operations Squadron, Detachment 2 • 214th Reconnaissance Group, MQ-1 Predator • 1196 Airman have deployed to date in support of OEF/OIF
Military Construction In Progress Water treatment plant $1.9M Water well $318K Breaking Ground next 24 months Florence Readiness Center (RC) $14.0M GTA funding Camp Navajo RC $11.6M GTA funding Papago Park RC $17.0M GTA funding Buckeye RC $19.5M BRAC project Florence Field Maintenance Shop $10.9M Fire Station Silverbell $ 2.5M Fire Station Camp Navajo $ 2.5M Safford Operational Maintenance Shop $ 1.5M Florence RC $ 5.1M FY11 Future Approved Projects Sierra Vista RC $ 8.0M FY12 Mohave County RC $ 8.8M FY13 – current lease until built Silverbell RC $24.8M BRAC project Total $128.4M
Encroachment Issues within Silver Bell AHP Training Area SDNM Arizona City development Housing developments Populated Pulte Homes La Osa Ironwood NM Over flights of Indian Reservations must remain above 500 AGL, avoid housing areas, and no landing rights exist. Eloy San Manuel Picacho Stagefield Oracle Silver Bell AHP Tohono O’odham Nation Marana No Fly Areas