IntroductionInjection well historiesTR10TR7TR1BAcid Job ProgramsWell Test AnalysisTotal injection projectConclusions. Location of Geothermal Projects. Berlin Geothermal field: 56 MWe, started June-199910 Production wells: -900 to -1000 masl, Average: 8.2 MWe18 Injection wells: -1200 to -1500 masl, Ranging 7-120 kg/sNo injection pumps to force water into injection wellsHot and cold injection lines: Low and high Injection pressures: 15,23 bargSome cases individual injection wells: a1139
E N D
1. Injection Improvements in Low Permeability and Negative Skin Wells, using Mechanical Cleanout and Chemical Stimulation, Berlin Geothermal Field,El Salvador GRC, 2007
Sparks, Nevada
2. Introduction
Injection well histories
TR10
TR7
TR1B
Acid Job Programs
Well Test Analysis
Total injection project
Conclusions
4. Berlin Geothermal field: 56 MWe, started June-1999
10 Production wells: -900 to -1000 masl, Average: 8.2 MWe
18 Injection wells: -1200 to -1500 masl, Ranging 7-120 kg/s
No injection pumps to force water into injection wells
Hot and cold injection lines: Low and high Injection pressures: 15,23 barg
Some cases individual injection wells: alternatively hot and cold injectate, according to the need.
Challenge: Increase generation from 49 to 56 MW Introduction
5. Injection wells intrinsically low permeability therefore permeability later created by hydrofracturing
Few fractures encountered
Fractures sealed with minerals
Presence of dykes filling in the fractures
Low permeability by solid particles transported from the production wells and silica fragments from the gathering system.
From year 2000-2006, 80% of wells with positive skin, have been cleaned. TR10, TR7 and TR1B skin wells:cleaned
Introduction
18. TOTAL INJECTION PROJECT
Pumping Station in pad TR1´s: Consists in a high pressure pumping station and it has three multistage horizontally axis pumps of 1300 HP each, Its nominal capacity is 220 kg/s and 75 bars.
Pumps are controlled by variable frequency drivers located at the same pad.
By the end of 2007, all the injection pads will be equipped with filters to keep silica particles from entering the injection wells.