1 / 11

Private Wildland Fire Resources Crews & Engines

Private Wildland Fire Resources Crews & Engines. Dick Reynolds Contract/Logistics Specialist R5 Fire & Aviation. Current Procurement Types. National Crew and Engine Contracts Local Contracts R-6 Crew and Engine Agreements Local EERAs for Engines

Download Presentation

Private Wildland Fire Resources Crews & Engines

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Private Wildland Fire Resources Crews & Engines Dick Reynolds Contract/Logistics Specialist R5 Fire & Aviation

  2. Current Procurement Types • National Crew and Engine Contracts • Local Contracts • R-6 Crew and Engine Agreements • Local EERAs for Engines All Contracts, Agreements and EERAs terminate prior to the 2005 season and are up for renewal

  3. Basic Contract Requirements Contractor Provides: • All necessary tools and equipment for the resource type, including PPE • Trained personnel to NWCG 310-1 or FSH 5109.17 standards • All Transportation (except Air) • Payroll and workers compensation and liability insurance

  4. National Crew Contracts - 05 • Currently being written for 05 by an Interregional Steering Committee. • Type 2 IA crews only • One-year contract with possible 2 one-year extensions. • Contractors bid for Designated Dispatch Points • Best Value Contract

  5. Regional Engine Contracts - 05 • Currently being written for 05 as a National template to be issued regionally • Type 3-6 (NWCG) Engines • One-year contract with possible 2 one-year extensions based on performance • Contractors bid for Designated Dispatch Points • Best Value Contract

  6. Changes for 2005 • Consumables available to the Contract Engines and Crew at no charge - AA Batteries - Plastic Sheeting - One Quart Plastic Canteens • On site laundry services are available to Contract Engines and Crews.

  7. Best Value Contract Selection Criteria • Company experience and past performance in wildland fire suppression • Qualifications and experience of key personnel (single resource and squad bosses) • Bid price

  8. Pre-Season Inspection • Through equipment inspection (GVWR, equipment list, safety check, functionality) • Review training records and certifications of key personnel • Review experience and qualifications of key personnel

  9. Incident Inspections • Mechanical safety inspection of all vehicles • Confirm all equipment requirements • Check qualifications cards of all personnel • Inspect PPE

  10. Questions ?

  11. Nat’l Contract Working Team • Neal Hitchcock – Team Leader – NIFC • Terry Brown – R6 • Kevin Erickson – R1 • Guy Pence – R4, Boise NF • Julie Vogan – R5 • Dick Reynolds – R5