230 likes | 524 Views
TWG-NPPCI, May 2007, Vienna: UK status. 2. Current status of NPP C
E N D
1. 1 Current status of NPP C&I in the United Kingdom T P Smyth
AMEC NNC, Knutsford, Cheshire, UK
2. TWG-NPPCI, May 2007, Vienna: UK status 2 Current status of NPP C&I in the United Kingdom
3. TWG-NPPCI, May 2007, Vienna: UK status 3 Nuclear Power Plants in the UK (1)
4. TWG-NPPCI, May 2007, Vienna: UK status 4 Nuclear Power Plants in the UK (2)? Electricity sources
20% nuclear
37% gas
34% coal
Need to plan for energy replacement
7 plants will close in next 11 years
14 reactors
7294 MWe
13% of electricity sources
North Sea oil and gas will be limited in future
23 May 2007
Government announces 20 week consultation process
Government wants to take decision this year
No public money
5. TWG-NPPCI, May 2007, Vienna: UK status 5 AGR : Reactor Protection Systems (1)?
6. TWG-NPPCI, May 2007, Vienna: UK status 6 AGR : Reactor Protection Systems (2)? Obsolescence of equipment
Difficulty in obtaining spares
Repairs
Replacement
Analogue trip units
Neoprene degradation
New equipment
Majority of protection parameters have been addressed
7. TWG-NPPCI, May 2007, Vienna: UK status 7 AGR : Reactor Protection Systems (3)? Neoprene insulation degradation
Magnox Oldbury power station
Degradation with age
Perishing
Sweating
Hygroscopic
Becomes conductive - resistance < 1 M?
Stray currents in sensitive circuits
Thermocouple amplifiers
8. TWG-NPPCI, May 2007, Vienna: UK status 8 AGR : Reactor Protection Systems (4)? Neoprene insulation degradation?
9. TWG-NPPCI, May 2007, Vienna: UK status 9 AGR : Reactor Protection Systems (5)? Neoprene insulation degradation
10. TWG-NPPCI, May 2007, Vienna: UK status 10 AGR : Reactor Protection Systems (6)? Neoprene insulation degradation
Survey of all safety equipment
Presence of neoprene
State of neoprene
Circuit function
Replacement equipment at older stations
Obsolescent anyway
Repairs at newer stations
Heysham 2 / Torness
4 years work, 2 more years to finalise all equipment
11. TWG-NPPCI, May 2007, Vienna: UK status 11 AGR : Reactor Protection Systems (7)? Neutron Flux measurement systems
AGR detectors located in core at 8 locations
High temperatures
Detector spares
Wide range detector integral cable
Manufacturing spares re-establishing production processes
Currently a batch of 10 in progress
Electronic units
Neoprene
Complete refit
Repairs at Heysham 2 / Torness
12. TWG-NPPCI, May 2007, Vienna: UK status 12 AGR : Reactor Protection Systems (8)? Diverse Guardline upgrade
Hinkley B / Hunterston B / Dungeness
Driven by licensing basis for nuclear power plants
Large subset of Main Guardline parameters duplicated
From 1995 to 2000
Heysham 2 / Torness had diverse guardlines from the outset.
Hartlepool / Heysham 1 were judged to have adequate diversity in protection systems
13. TWG-NPPCI, May 2007, Vienna: UK status 13 AGR : Data Processing Systems Safety claims on equipment
Some reactor control functions
Some alarms
Hinkley Point B
New DPS installed (1999)?
Dungeness B
New DPS being installed
Control / equipment protection functions segregated
Other AGR's
Stabilization of equipment
Adequate spares provision / hardware support.
Improved air conditioning
Limited re-manufacturing (optical transceiver boards)?
14. TWG-NPPCI, May 2007, Vienna: UK status 14 AGR : Refuelling Machines (1)?
15. TWG-NPPCI, May 2007, Vienna: UK status 15 AGR : Refuelling Machines (2)?
16. TWG-NPPCI, May 2007, Vienna: UK status 16 AGR : Refuelling Machines (3)? Online refuelling
Stringent safety requirements
Equipment obsolescence
Key focus at present
Heysham 2 / Torness
Replacement of Reypac controllers with Siemens S7
I/O replaced, emulates original equipment
Reypac controller replacement in progress
Software reverse engineered and ported
Safety functions partitioned
Safety standards
Modern standards considered when replacing equipment
17. TWG-NPPCI, May 2007, Vienna: UK status 17 PWR : Principal C&I Systems (1)?
18. TWG-NPPCI, May 2007, Vienna: UK status 18 PWR : Principal C&I Systems (2)? Equipment Life cycle management
Review of equipment status
Review of spares holdings
Participation of OEM (Westinghouse)?
HICS
Optical transceiver units obsolete
New units re-engineered by Westinghouse
Adequate spares manufactured
19. TWG-NPPCI, May 2007, Vienna: UK status 19 Simulators Sizewell B
On site
Replaced in 2003
Duplicate DPS
Can be modified at the same time as the main DPS
WANO recommendation
AGR's
Goal was to establish a simulator at each site
Hartlepool - new simulator
Heysham 2 / Torness
Upgraded to increase fidelity
WANO recommendation
20. TWG-NPPCI, May 2007, Vienna: UK status 20 Regulatory Environment (1)? Standards hierarchy
NII SAPS
IAEA standards
IEC standards
IEC 61226
PSA based assessment
Target 10-7 / year
Limit of reliability claims for software based systems
Assume 1 demand / year
10-4/demand
Require diverse protection to make up 10-3/demand
21. TWG-NPPCI, May 2007, Vienna: UK status 21 Regulatory Environment (2)? Application to Sizewell B
Primary Protection System
Four channels, 2 out of 4 tripping
Software based
Production excellence
IEC 61880
Independent confidence building
Extensive testing
Independent code safety assessment
Secondary Protection System
Four channels, 2 out of 4 tripping
Protection for frequent faults
Laddic magnetic amplifiers
Diverse technology
22. TWG-NPPCI, May 2007, Vienna: UK status 22 Regulatory Environment (3)? New build
In general, same regulatory requirements as Sizewell B
Diversity requirements in reactor protection systems
Possibly lower protection system targets
Passively safe systems will make fewer demands
Commercial Off the Shelf systems
Assessment of evidence
Smart Instruments
Regulator considering application to nuclear facilities
Assessment of evidence
23. TWG-NPPCI, May 2007, Vienna: UK status 23 Recommendations IAEA topics
Estimating and extending life of I&C equipment to address ageing and obsolescence
Supporting the evaluation, acceptance and licensing of digital I&C system
Lessons learned from I&C project implementation and guidance for modernisation and new plant project