1 / 22

2 Bedroom / 2 Bath 1240 Sq. Ft. Floor Plan Areas of Interest (#1) Hall Bath (#2) Kitchen (#3) Master Bath (#4)

2 Bedroom / 2 Bath 1240 Sq. Ft. Floor Plan Areas of Interest (#1) Hall Bath (#2) Kitchen (#3) Master Bath (#4) Air Conditioner (#5) Threshold. (#1) BEFORE Hall Bathroom. Back to Floor Plan. (#1) AFTER Hall Bathroom Remove the wing wall to increase maneuvering room

Mercy
Download Presentation

2 Bedroom / 2 Bath 1240 Sq. Ft. Floor Plan Areas of Interest (#1) Hall Bath (#2) Kitchen (#3) Master Bath (#4)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2 Bedroom / 2 Bath 1240 Sq. Ft. Floor Plan • Areas of Interest (#1) Hall Bath (#2) Kitchen (#3) Master Bath (#4) Air Conditioner (#5) Threshold Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  2. (#1)BEFORE • Hall Bathroom Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  3. (#1)AFTER • Hall Bathroom • Remove the wing wallto increase maneuvering room • Note: Interior door left in place Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  4. (#1) AFTER • Hall Bathroom • Remove the wing wallto increase maneuvering room • Note: Interior door removed Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  5. (#1) BEFORE • Tub Grab Bar Reinforcing Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  6. (#1) AFTER • Tub Grab Bar Reinforcing • Install “wing-it” mounted grab bars Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  7. (#1) BEFORE • Toilet Grab Bar Reinforcing Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  8. (#1) AFTER • Toilet Grab Bar Reinforcing • Install “wing-it” mounted grab bars Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  9. (#1) BEFORE • Hall Bathroom Toilet Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  10. (#1) AFTER • Hall Bathroom Toilet • Relocate the toilet using an offset toilet flange or furr-out grab bar Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  11. (#2) – BEFORE • Kitchen Range • Note: Cabinet located to right of stove Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  12. (#2) AFTER • Kitchen Range • Modify location of range and/or make adjacent cabinet removable to provide centered clear floor space • Note: Cabinet is left in place Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  13. (#2)AFTER • Kitchen Range • Modify location of range and/or make adjacent cabinet removable to provide centered clear floor space • Note: Cabinet is removed upon request Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  14. (#2) BEFORE • Kitchen Counter Outlets • Standard outlet Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  15. (#2) AFTER • Kitchen Counter Outlets • Provide a surface mounted outlet extender Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  16. (#2) BEFORE • Framed Room Openings (Doors) - to Kitchen • Note: Trim on doorway Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  17. (#2) AFTER • Framed Room Openings (Doors) - to Kitchen • Remove wood base trim to increase door width Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  18. (#3) BEFORE • Framed Room Openings (Doors) - to Master Bath • Heater in place Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  19. (#3) AFTER • Framed Room Openings (Doors) - to Master Bath • Relocate the baseboard heater unit away from the Master Bath entry to provide 32” nominal width Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  20. (#4) AFTER • Bedroom Air Conditioner Controls • Install remote air conditioner Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  21. (#5) AFTER • Primary Entry Door Thresholds • Modify (lower) primary entry door thresholds Back to Floor Plan Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

  22. If you wish to request any of these accessibility features please contact the Resident Manager. • Press the ESC key to exit. Cedar Property Management(509) 489-4287 office@cedarpropertymgmt.com

More Related