Well Come Everybody

Well Come Everybody. Discussion on Financial Management of sub-project. Project Cost as per DPP. Figure in Lac BDT. GOB = 103,46.49 Salary & Allowance = 6% VAT & Tax = 92% Other = 2%. A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax.

Mia_John
Download Presentation

Well Come Everybody

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WellComeEverybody Discussionon Financial Management of sub-project

  2. Project Cost as per DPP Figure in Lac BDT

  3. GOB = 103,46.49 Salary & Allowance = 6% VAT & Tax = 92% Other = 2%

  4. A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax

  5. A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax

  6. A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax

  7. A = 1,000,000.00 v = 10 % t = 5%

  8. Contract Amount = 1,176,470.59 v = ? t = ?

  9. Contract A = 1,176,470.59 v = 117,647.06 t = 58,823.53

  10. A = 1,000,000.00 v = 7 % t = 3%

  11. Contract Amount = 1,111,111.11 v = ? t = ?

  12. Contract Amount = 1,111,111.11 v = 77,777.78 t = 33,333.33

  13. Infra Sub-Project • Bill Preparation and • TAX-VAT deduction from bill

  14. CD Sub-Project • Bill Preparation • Bank Statement • Summary of Expenditure • Others

  15. Thanks