An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lean Networking An experiment in the application of best-in-class business practices to network and IT management

  2. A Lean Perspective • Lean is a compilation of “world class business practices” including • The Toyota Production System, • Waste Elimination • Process/Continuous Improvement • Other quality certifications (six sigma, ISO 900x)

  3. Traditional Lean is immediately identifiable by these buzzwords: • Just In Time (ジャストインタイム) (JIT) • Kanban (看板, also かんばん) (engl.: Sign, Index Card) • Muda (無駄, also ムダ) (engl.: Waste) • Heijunka (平準化) (engl.: Production Smoothing) • Andon (アンドン) (engl.: Signboard) • Poka-yoke (ポカヨケ) (engl.: fail-safing - to avoid (yokeru) inadvertent errors (poka)) • Jidoka (自働化) (engl.: Autonomation - automation with human intelligence) • Kaizen (改善) (engl.: Continuous Improvement)

  4. Lean Purpose To eliminate all waste or non value added activities from a process. • This is not a “once over” audit but a real-time activity • Not meant to eliminate people, but to use them most wisely

  5. The Essential Lean Tools have the following outcomes • Identifies and eliminate waste quickly and efficiently • Increase communication at all levels of the organization • Reduce costs, improve quality and delivery in a safe environment • Begin improvements immediately and empower workers to make improvements themselves

  6. A time for Lean at Oakland • One of Oakland’s Trustees and benefactors endows the Pawley Institute - a lean methodology think tank and training center • Recent Fiscal pressures in the region and state requires rethinking funding strategies at even the Unit level. • The expectation of network operations (24x7) with a limited staff (8x5) requires new efficiencies • The right mix of people – the team synergy is open to trying new approaches to daily network operations

  7. So … how to get Lean • There are several “dialects”, cultural variations, para-lean, and lean-alikes. • The textbook on Lean is written by Jeffery Liker (U of M), “The Toyota Way” (2003)

  8. 14 Principlesfrom Jeffrey Liker’s “The Toyota Way” • Base your Management decisions on a long-term philosophy, even at the expense of short term financial goals • Create continuous process flow to bring problems to the surface • Use “pull” systems to avoid over-production

  9. 14 Principles ContinuedPrinciple 4 • Level out the Load (Heijunka) • Reduce Muri – the overburden of people and equipment that results in safety, quality, and performance problems (vs. sustainable pace) • Reduce Mura – or unevenness. If the workload or the type of work fluctuates wildly from one moment to the other, people (and machines) never "get into the rhythm" and waste time switching between tasks. The production stalls and restarts all the time.

  10. 14 Principles ContinuedPrinciple 5-7 • Build a culture of stopping to fix problems, to get quality right the first time. • Standardized tasks: these are the foundation for continuous improvement and employee empowerment • Use visual control so no problems are hidden

  11. 14 Principles ContinuedPrinciple 8-10 • Use only reliable, thoroughly tested technology that serves your people and process • Grow leaders who thoroughly understand the work, live the philosophy and teach it to others • Develop exceptional people and teams who follow your company's philosophy

  12. 14 Principles ContinuedPrinciple 11-13 • Respect your extended network of partners and suppliers by challenging them and helping them improve • Go and see for yourself to thoroughly understand the situation (Genchi Genbutsu) • Make decisions slowly by consensus, thoroughly considering all options; implement decisions rapidly

  13. 14 Principles ContinuedPrinciple 14 • Become a learning organization through relentless reflection (Hansei) and continuous improvement (Kaizen)

  14. The Experiment: Can lean principles be applied to IT management? • These principles were originally designed for manufacturing but they have been ported to other areas of business and technology, including software and systems development, so … • Will the outcomes actually result in the positive gains realized in other verticals: less waste, increased communication, increased quality and cost savings, and effective use of people? • Network vertical provides a case study

  15. Base your Management principles on your long term philosophy All information technology initiatives are related to the University Mission, the strategic goals, and the OU in 2010 initiative. Every network component has a strategic orientation as it’s engine (projects are not simply industry driven or a person or divisional project) Principle 1 - Application

  16. Create Continuous Process Flow to bring problems to the surface (there is also a concept of “design for rapid changeover”) Projects and upgrades happen cyclically (no “all at once” or “forklift” if possible … this way problems can be corrected on the way Change occurs during regularly scheduled weekly change management windows Principle 2 - Application

  17. Use "Pull" systems to avoid overproduction The network is not “overbuilt”. Equipment is provided in an as-needed basis, with a small margin for growth. The shelf time for inventory is not more than 90 days (with the exception of spares) There is no active storage space … equipment is immediately moved to staging and then to production Redundancy/HA is minimized except where absolutely necessary or required Principle 3 - Application

  18. Level out the load (Heijunka) Cyclical replacement keeps the network updated and evergreen on an ongoing basis. Age failures are mitigated Systems are designed to operate at the mid-point or just above of their processing capacity. Staff learns nuances of the technology over the cycle time (reduces staff training burnout) Principle 4 - Application

  19. Build a culture of stopping to fix problems, to get quality right the first time The right solution is encouraged as a design option (and not simply the lowest cost or fastest implemented). Staff are encouraged to reveal and correct problems through self audit Management is friendly is asking the question “how do we do it right” first instead of “how fast can it be done, how expensive will it be” Principle 5 - Application

  20. After years of “The “get it done” method The stop to do it right method Before and After

  21. Before and After

  22. Standardized tasks are the foundation for continuous improvement and employee empowerment LEAN works because each closet has standards. Parts are interchangeable, cables and cable lengths are standard. Staff are empowered to make changes during the pre-scheduled change periods Each staff member is an expert in their vertical product line Principle 6 - Application

  23. Use visual control so no problems are hidden The five steps in the process: Sort through and sort out Set things in order and set limits Shine and inspect through cleaning Create and set standards Educate and communicate Principle 7 - Application

  24. Step 1 • Sort Through and Sort Out • Legacy equipment in closets that have no owner, no purpose, and no power supply (hey … this thing isn’t even plugged in) is eliminated • Asset inventory of every element in every closet is taken • This increases morale and responsibility by ensuring that every area is ordered and is an element of pride.

  25. Before and After

  26. Step 2 • Set things in order and set limits • Everything in the network closets have their place. • Every network closet is designed according to a common standard or layout • Missing items and many problems can be solved visually • Example: Patch cable color is used to identify the generation of networking and the category of the connection. In a previous iteration, patch cable boot color was used to identify length of cable.

  27. Order and Limits

  28. Step 3 • Shine and inspect • There is no closet or workspace that is not visited on a regular basis • Cleaning and pickup is part of every visit (even if for a cross connect) • Annually, the whole team walkthrough of the entire facility to evaluate, reorganize, and cleans

  29. Another example … • The last working day of December is a departmentally mandated “clean-up, clean out” day. This steps through each of the previous elements.

  30. Step 4 – Create and Set Standards • The team has worked to standardize at every “layer”. • The standards are practical and pragmatic (clear descriptions are encouraged and the goal is to make it counter-intuitive to do a task or project in any other way) • As an example, our wiring standards moved from a 100+ page document to a 22 page document.

  31. Step 5 – Educate And Communicate • Standards are not internal documents, they are linked to University Policy and then made available to the community • Standards and policies communicated specifically to the distributed/divisional technology through a monthly roundtable meeting and via an Annual Retreat sponsored by Central IT. • Annually, the central IT group holds campus awareness events where standards and policies are communicated to the whole campus • External groups are made aware of the standards

  32. Use only reliable, thoroughly tested technology that serves your people and process Oakland has determined that we don’t want to be leading or trailing edge. “Best” technologies are evaluated from a variety of different perspectives: trade recognition, peer use and review, RFP with references Principle 8 - Application

  33. Grow leaders who thoroughly understand the work, live the philosophy and teach it to others Network management is not about the next wire that is plugged in, it is about how we accomplish the goal. The CIO is committed to this fact Principle 9 - Application

  34. Develop exceptional people and teams who follow your company's philosophy Training is a given in the Oakland Environment. Each staff member is given training stretch goals annually. Teams and teamwork are promoted above the individual Principle 10 - Application

  35. Respect your extended network of partners and suppliers by challenging them and helping them improve Projects at Oakland are opportunities for vendors to excel at what they do. To offer the best designs, the best products, and the best prices Principle 11- Application

  36. Go and see for yourself to thoroughly understand the situation (Genchi Genbutsu) Technical staff is encouraged not to manage by phone. Site visits are encouraged. Vendors are encouraged to visit the site. Annually, Sr. Management (The Division VP takes the unit management on a walk-around through the office and operational spaces. Principle 12 - Application

  37. Make decisions slowly by consensus, thoroughly considering all options; implement decisions rapidly All perspectives are considered and consulted: customer, (student, faculty, staff), managerial, and technical Execution is fast to eliminate excess inventory and technology aging Principle 13 - Application

  38. Become a learning organization through relentless reflection (Hansei) and continuous improvement (Kaizen) Every project has a post-project review. Cyclical upgrades and installations allow for continuous improvement Current management understands that mistakes are learning opportunities Principle 14 - Application

  39. Obstacles to this type of management: • Perception: This adds more overhead with no value • Moore’s law: The pace of technology change is sometimes not conducive to this type of cyclical planning and approach. • “Its not my job”

  40. The Result: • Lean management is portable to technology • Oakland’s central IT group delivers projects with little or no waste, translating to cost savings understood by other business divisions. • The time to deliver has been vastly reduced and internally, the network group has cut installation times by over 50 -60% • Staff members are directly connected to the delivery of services identified as critical to some aspect of the University’s mission or purpose.