1 / 14

RESET & Technology Insertion

RESET & Technology Insertion. BG Roger A. Nadeau DCG, Systems of Systems Integration RDECOM 9 September 2004. RESET. Return Systems to Pre-deployment Condition Inspect and Repair to 10/20 Standards Eliminate Desert Induced Damage Repair Crash / Battle Damage Systems

Mia_John
Download Presentation

RESET & Technology Insertion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RESET&Technology Insertion BG Roger A. Nadeau DCG, Systems of Systems Integration RDECOM 9 September 2004

  2. RESET • Return Systems to Pre-deployment Condition • Inspect and Repair to 10/20 Standards • Eliminate Desert Induced Damage • Repair Crash / Battle Damage Systems • Replace Attrited Systems • Apply Approved MWOs • Apply Enhancements to Address Critical, Safety, Readiness and Warfighting Deficiencies Done in Theater of Operations

  3. RECAP • Return Systems to Near Zero Hours / Zero Miles Condition • Technology Insertion Where Appropriate Done at Depot/Industry Location

  4. Lethal Survivable Dominates the Battlefield Agile Survivable Heavy Task Force, Force Multiplier

  5. Not Invincible Needs Survivability Enhancement Options

  6. Agility Better Suited to Army Transformation Survivability through Agility

  7. SASO/MOUT Survivability Enhancements Critical

  8. Non-Linear Battlefield Puts Thin Skinned Assets at High Risk Must Have Survivability Options for Tactical Truck Fleet Reliability Enhancements Also a Critical Need

  9. PEO Programs FY1 FY2 FY3 FY4 FY5 FY6 FY7 FY8 FY9 Program 1 Program 2 Program 3 Technology Insertion What is needed? Expected? When? With how much risk? What is coming? From who? When? Does it work? With how much risk? My investment? Current Transition Processes For S&T Projects S&T Organizations FOG OF TECHNOLOGY TRANSITIONS X X X X Army S&T X Other DOD S&T X Other Govt S&T X Products for the Warfighter U.S. Industry S&T International S&T User Needs, Requirements, Experiments, Assessments

  10. BACKUP

  11. Operational Readiness Impacts Enablers • Funding • Long Lead Time Parts • Induction • Seed Assets • Backfill / Swap-out with Return of Assets for Theater • Reduces Lead-time of Return to Units • Buy At Least 90 days of Readiness Must Have for Next Fight End State • Supports DA G3 Priorities

  12. AMC Reset Summary APS Non - APS • 995 Aircraft to be Reset • 789 Aircraft Available for Reset, (Worldwide) • 210 Aircraft Currently Inducted • 281 Aircraft Completed • 206 of 218 Unit Sets Turned in. • Currently Supporting CONOPS. • Scheduled to Support OEF-5 / OIF-3. • Tasked to Prepare 1215 Trks ISO CMATT. Total Issued 263 SWA Returns Aviation • 1X1 Bde ( Watson) On-Station SEP 03 • 1 CL V ( Page) On-Station Jul 04 • 1 CS1(TBD):Apr 05 • Sustainment Cargo Ship: TBD • HA/DR Ship: TBD ARF (Guam) • 9 Battalions Scheduled for Reset • 3 Battalions Inducted (Bliss, Germany, Qatar) • 6 Battalion Completed (Bliss, Germany) Patriot • 1X1 Bde ( Soderman), May 04 • CS2: (TBD) • 1 CL V ( Carter), Mar 04 • Sustainment Cargo Ship: TBD • HA/DR Ship: TBD • 3 ID on Target to meet July Reset. • Equip f/ 82d & 101st Moving to Depots. • Selected Seeds Approved for Depots. • (Tanks, Bradleys, HETS, HMMWVs, etc.) ARF (Diego) Ground Systems

  13. RC DEMOB CELLS Redeployment Equipment Flow THEATER CONUS Equipment Requiring Depot Level Maint DEPOT AMC UNITS Redeployment Assembly Area AC Home Station Units Serviceable & Reparable Equipment Chain of Cmd Responsible for TM 10/20 Inspections and maintenance Mob Station Home Station RC • THEATER: • 10/20 TI & ORDER, APPLY PARTS • PROPERTY BOOK INVENTORY, ADJUSTMENT DOCUMENTS POSTED, REQUISITIONS PREPARED • REDEPLOY PARTS LISTING AND PROPERTY BOOK REQUISITIONS WITH UNIT PERSONNEL • AMC TO PROVIDE ASSISTANCE AS REQUIRED • HOME STATION/DEMOB STATION: • AC: SUBMIT PROPERTY BOOK AND 10/20 REQUISITIONS • RC: SUBMIT REQUISITIONS FOR PROPERTY BOOK LOSSES • RC: DMS VALIDATES FMC PRIOR TO SHIPMENT TO HOME STATION • RC: 10/20 REQUISITIONS PROCESSED • RC: DEMOB CELLS WILL ACT AS EXECUTIVE AGENT AT EACH DEMOB SITE. WILL VERIFY ARRIVAL, FMC STATUS AND FACILITATE MOVEMENT OF EQUIPMENT TO HOME STATION.

More Related