Ecological Research

ТОО “SED”. Ecological Research. Almaty, 200 9. Assessment of current environmental condition ( baseline study ). Environmental Impact Assessment of planned activity. Monitoring of Environmental Impact caused by industrial objects and processes.

MikeCarlo
Download Presentation

Ecological Research

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ТОО “SED” Ecological Research Almaty, 2009

  2. Assessment of current environmental condition (baseline study) Environmental Impact Assessment of planned activity Monitoring of Environmental Impact caused by industrial objects and processes Development of “Environmental Protection” chapters for technical projects Ecological audit Special research Services

  3. Environmental Impact Assessment of planned activity

  4. Environmental Impact Assessment of planned activity

  5. Environmental Impact Assessment of the Offshore Projects and Project in Transition Zone EIA of Koltyk oil deposit pilot exploitation project. OJSC “MunayGas” EIA of offshore pilot-methodic seismic works at South Zhambay– South Zaburunje sites. CJSC “KazMunayGas” EIA of exploratory well No 1 construction at Tub-Karagan area. “Tub-Karagan Operating Company BV” EIA of Tub-Karagan gulf east coast. CJSC NC“KazMunayGas” EIA of exploratory well No 1 and 2 construction at Kurmangazy area. MNC “KazMunayTeniz”

  6. Assessment of current environmental condition (baseline survey) Baseline ecological survey of environmental condition within water area of Kurmangazy structure in 2002. «KazMunaiGas» CJSC Ecological researches of environmental conditions within South Zhambay – South Zaburunye water area. «Zhambay» LLP Baseline ecological survey at Atash site. Baseline surveys of environmental condition at Kurmangazy site in 2003. LLP “Atash Company” MNC “KazMunayTeniz” Baseline ecological researches at Tub-Karagan site. LLP “Tub-Karagan Operating Company BV” Assessment of current environmental condition within Imashevskoye deposit area. Baseline ecological researches at “N” site. OJSC “Munaygas” CJSC NC“KazMunaiGas”

  7. Ecological Monitoring • The objects of monitoring • Atmosphere • Resources of polluters disposal intoatmosphere • Domestic and industrial flowing • Industrial and consumption wastes • Soils • Flora • Fito zoo plankton, benthos • Fauna Monitoring of the impact on the environment caused by gas compressor stations. CJSC “Intergas Central Asia” Monitoring of environment current condition on objects of “KazTransOil” CJSC. CJSC “KazTransOil” Local monitoring of environment current condition on Ktykmytyk field. CJSC “Anako” Monitoring of environment current condition during execution of offshore seismic acquisitions. LLP “Zhambai” Monitoring of seismic acquisition at Tub-Karagan site. LLP“Tub-Karagan Operating Company BV” Monitoring of seismic acquisition at Atash site. LLP “Atash Company”

  8. Ecological Audit SERVICES AND PROJECTS Pointing out and mapping of damaged landscapes identification of scales and intensity of pollution with heavy metals and oil products Development of recommendations on damaged sites rehabilitation Approval of audit results with state bodies Ecological audit of Zhusaly site. РННО “Petrom SA – Kazakhstan” Assessment of technical condition of suspended well mouth at West Eskene site. Agip KCO Ecological audit of Sinelnikovskoye contract territory. LLP “Ozturk Munay” Assessment of previously drilled well mouth at Sinelnikovskoye deposit. LLP “Ozturk Munay”

  9. Special Surveys Radioecological survey Location and contouring of polluted areas Estimation of the area and radioactive pollution intensiveness Classification of anomalies’ radioactive composition Estimation of polluted grounds volume Recommendations on minimization of radiation risks During operations execution the major accent was madeon the safety of staff Оценка рисков и разработка мероприятий по их минимизации Individual means of protection Operative dissymmetric control Investigation on Body Counter, before commence and after operations completion (Kurchatov city, IRB)

  10. Special Surveys Ecological geochemistry of technology Definition of biological objects pollution level Geochemistry of transition zonesea – land Study of environment pollution processdynamics Estimation of environment conditions changes resulted from technogenic impact Recommendations aiming to decreaseenvironmental impact on differentcomponents

  11. Partners and consultants

  12. Laboratories and Analytical Base OUR SUBCONTRACTORS • Defining of hard metals on soils, water, and biological objects: • “Alex Stewart (Assayers) LTD” laboratory –ICP methods • Laboratory on the environment protection – atom-absorbent method , Atyrau city • Laboratory Industrial Engineering Center “Geoanalitika” – atom-absorbent, chemical and spectrum, methods, Almaty city • Defining of oil products, polycyclingaromatic hydrocarbons, phenols in soils, water, and biological materials: • Laboratory of the Institute of chemical sciences mass-spectral method, Almaty city • Defining of polluters in atmosphere and industrial disposals: • Laboratory on the environment protection, Atyrau city • “Ecoproject”, Almaty city • “Kazecoanalyz” LLP , Almaty city • Researches of gydrobintes (fitozooplancton, benthos, ichtuofauna): • Atyrau affiliate of Kazakh Institute of Fish Industry, Atyrau city • Caspian institute of fish industry, Astrakhan • Laboratory “Atyraubalyk” JSC, Atyrau city

  13. Our Principles Compliance with environmental legislation and regulatory requirements of the Republic of Kazakhstan Fulfillment of overall Customer’s requirements Compliance with ecological; safety norms, mitigation of environmental impact during works Strict compliance with the provisions ofHealth and Labor Protection Systemdeveloped in Company

  14. Priority Compliance with overall rules of health and labor protection Compliance of performed works with regulatory documents of the Republic of Kazakhstan Work quality Situation control – beginning from technical assignment creation and ending with public hearings and approval of work with Competent State Bodies

  15. Projects execution Project execution is performed with adherence to corporate standards CS1-CS13 Quality Management System Management is implemented based on resource planning using the licensed software systems Prima Vera orMicrosoft Project Execution is implemented using Kazakhstani and International Standards Projects are executed taking into account Customer’s special requirements

  16. Techniques and Methods Modern navigation equipment– GPS «Garmin-12» GIS technology – ArcGIS (ArcInfo), 9.0 MapInfo 7.0 Modern software for the obtained data processing– Surfer, Grafor, Envi, MapSourse Satellite communication –telephones «THURAYA» Satellite images of various resolution– Lansat, IRS, Iconas

  17. Thank you for attention! «SED» LLP 3 Askarov, Almaty, 050043 Republic of Kazakhstan Tel.: (+7 727) 255-05-07, 295-48-19, 226-66-88 Fax: (+7 727) 295-48-20 Е-mail: sed@sed.kz, www.sed.kz