1 / 14

Updated April 2010

Updated April 2010. 1. GENERAL INFO R MATION. 2. ORGANIZATION. 3. PRODUCT INFORMATION. 4. KNITTING. 5. DYEING. 6. FINISHING. 7. SCREEN PRINTING. 8. LAB & Q.C. 9. OTHER FACILITIES. CONTENTS. LOCATION. KM 19.5, CARRETERA A OCCIDENTE LA ACEQUIA, NACO,

Philip
Download Presentation

Updated April 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updated April 2010

  2. 1. GENERAL INFORMATION 2. ORGANIZATION 3. PRODUCT INFORMATION 4. KNITTING 5. DYEING 6. FINISHING 7. SCREEN PRINTING 8. LAB & Q.C. 9. OTHER FACILITIES CONTENTS

  3. LOCATION KM 19.5, CARRETERA A OCCIDENTE LA ACEQUIA, NACO, QUIMISTAN, SANTA BARBARA, HONDURAS, C.A. TEL: (504) 672-2000 FAX: (504) 672-2010 ESTABLISHED JUNE, 2001 START OF OPERATION MARCH, 2003 AREA OF LAND 8,870,000 ft2 (204 ACRE) BUILDING : 522,000 ft2 (12 ACRE) ANNUAL TURNOVER US$ 42,500,000 (2009 EXPORT) PERSON TO CONTACT President : JT Kim e-mail: jtkim@woongchun.comMarketing: Jason Kim(cotton) e-mail: chiburm@woongchun.com Sunny Lee(cotton) e-mail: sunnylee@woongchun.com Justin Jeon(synthetic) e-mail: jsh9083@woongchun.com EMPLOYEES 560 (Including 40 KOREAN) MAJOR CUSTOMERS ADIDAS REEBOK, AEROPOSTALE, HANES, JCP, KOHLS, NIKE 1. GENERAL INFORMATION

  4. Others 4,000 ft2 • Soccer Field, Swimming Pool, • Medical Center with Ambulance • Dormitory for Home/Local Staffs Mill A (Dyeing/Finishing) 220,000 ft2 Mill B (Circular Knitting)120,000 ft2 Mill C (Warp Knitting & 160,000 ft2 Circular Knitting) Mill D (Chemicals) 22,000 ft2 Wastewater Treatment 5,000 ft2 Utility 3,000 ft2 Cafeteria 3,300 ft2

  5. WOONGCHUN HONDURAS, S.A

  6. PRESIDENT (JT KIM) MARKETING & PLANNING (JASON KIM) PRODUCTION (YK OH) DYEING (JM KIM) KNITTING ADMINISTRATION (LUIS RYU) Q.C. 2. ORGANIZATION CHAIRMAN (OH KWON) MARKETING COTTON(SUNNY LEE) DYEING COTTON(KJ LEE) WARP KNIT(ALBERTO KIM) COTTON(DJ LEE) MAINTENANCE(MARCO KIM) MARKETING SYNTHETIC(JUSTIN JEON) DYEING SYNTHETIC(HJ KO) CIRCULAR KNIT(ANTONIO KIM) SYNTHETIC(KELLY LEE) ACCOUNTING(DANIEL KIM) PLANNING(DENIS LEE) R & D(ADRIAN KIM) HUMAN RESOURCE(NAUN CRUZ)

  7. 3. PRODUCT INFORMATION PRODUCTS SYNTHETIC WARP KNITTED DAZZLE & MESH CIRCULAR KNITTED JERSEY & INTERLOCK OTHERS COTTON SINGLE JERSEY & PIQUE RIB & INTERLOCK 2END & 3END FLEECE OTHERS MONTHLY CAPACITY SYNTHETIC : 2,000,000 YDS ( 1,000,000 LBS) COTTON : 1,500,000 KGS ( 3,300,000 LBS) FACILITIES WARPING MACHINES : 6 WARP KNITTING MACHINES : 28 CIRCULAR KNITTING MACHINES :212 DYEING MACHINES : 32 FINISHING MACHINES : 55

  8. CIRCULAR WARP MAIN FACTORY SINGLE 146 FLEECE 26 INTERLOCK & RIB 32 POLAR FLEECE 8 212 WARPING MACHINES : 6 Sets CAPACITY : 60,000 Yds/day SUB-CONTRACTORS SINGLE 139 INTERLOCK & RIB 55 194 WARP KNITTING MACHINES: 28 Sets CAPACITY : 60,000 Yds/day 4. KNITTING

  9. THIES THIES THIES THIES THIES THIES THIES 1,500Kg 30Kg 500Kg 250Kg 1,000Kg 750Kg 4 1 1 2 2 2 THIES 10Kg 2 14 A. K HIGH PRESSURE (for synthetic) NORMAL PRESSURE (for cotton) A. K A. K A. K Dong A A. K A. K A. K A. K 1,000Kg 500Kg 1,200Kg 600Kg 200Kg 100Kg 1,000Kg 800Kg 1 1 2 2 2 1 4 1 8 A. K A. K 250Kg 50Kg 2 1 A. K 30Kg 1 10 5. DYEING

  10. TENTER NET DRYER BRUSHING OPEN COMPACT SHEARING TUBE COMPACT 6. FINISHING

  11. 7. SCREEN PRINTING - Capacity : 8,000 yds/day

  12. 8. LABORATORY SPECTROPHOTOMETER STRETCH TESTER PILLING TESTER PERSPIROMETER CROCKING TESTER SCORCH TESTER

  13. BOILER 15ton x 2 Set 3,000,000kcal x 3 Set GENERATOR ROOM GENERATOR 3,300V 1,200KW X 4 Set 9. OTHER FACILITIES

  14. WASTEWATER TREATMENT NATURAL TREATMENT WASTEWATER TREATMENT PLANT Capacity : 8,000 Ton/day

More Related