1 / 8

Ratul Puri Presenting Anuppur Thermal Power Project

Mr. Ratul Puri is the Chairman of the Board of Directors of Hindustan Powerprojects Private Limited (Hindustan Power). His vision and understanding of the Indian energy sector has enabled the organization to emerge as one of the leading integrated power players in the country. During the last five years, under his guidance the company has partnered with best in class investors to be a part of its growth story. Today in a short period, the company has assets to the tune of USD $2 billion which is a standout achievement for any organization in the country.<br>

RatulPuri
Download Presentation

Ratul Puri Presenting Anuppur Thermal Power Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RatulPuri Chairman Of Hindustan Powerprojects

  2. Anuppur Thermal Power Project By Hindustan Powerprojects The thermal arm is developing 2520 MW coal based Thermal Powerproject in Anuppur district, Madhya Pradesh. The project is planned to be executed in two phases as follows: Phase - 1 : 1200 MW (2X600 MW) Phase - 2 : 1320 MW (2X660 MW) It is currently implementing the first phase of 1200 MW (2X600 MW) through its SPV (Special Purpose Vehicle) i.e. MB Power Madhya Pradesh Limited (MBPMPL). Coal for the project will be sourced from South Eastern Coalfields and water will be sourced from River Son.

  3. The company has set new benchmarks in the power sector by achieving critical mile stones (in terms of land acquisition, coal and water linkage, securing various statutory and other clearances and award of various contracts) in a record time.. It is currently implementing the first phase of 1200 MW (2X600 MW) through its SPV (Special Purpose Vehicle) i.e. MB Power Madhya Pradesh Limited (MBPMPL). Coal for the project will be sourced from South Eastern Coalfields and water will be sourced from River Son.

More Related