An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Midwest Association of Rail Shippers Itasca, Illinois 1/11/2006 Roy Blanchard, The Railroad Week in Review The Value-Added Shortline Railroad MWARS 1/11/2006

  2. The Shortline Railroad Universe: • More than 600 shortline names, 53,000 route miles, 12 mm cars per year (cpy)* • 32 S&Ts (BRC et al), steel roads (EJ&E) have 2600 route miles, 5.2 mm cpy • NS has most (253), CP fewest (61) • Top 20 SL ops companies (ex steel, S&T) - 174 roads, 27,000 miles, > 4 mm cpy • Top 5 Commodities: 13% chemicals, 10% grain, 9% coal, 8% metals and related, 8% ores. *More accurately, revenue units (I’ll explain) MWARS 1/11/2006

  3. MWARS 1/11/2006

  4. Shortline Growth • Most roads started as Class I branch lines • Staggers Act encouraged spin-offs • Only BNSF, CSX shedding lines now, mostly leases • 3Q05 SL carloads up 16% to Class Is’ 3%, 90,000 units to Class Is 47,000. • Shortline growth masking Class I losses? Not necessarily – Class Is focus on core routes, more local business to shortlines. MWARS 1/11/2006

  5. Giblin’s Transit Time Rule:All dock-to-dock TTs have three parts • Transit time between terminals (line haul). • Time spent in terminals. • Pick-up and delivery time. MWARS 1/11/2006

  6. Reality Check • Motor carriers consistently do all 3 very well (note that highway driving time only one part of 3 part equation). • Class I railroads are very good at the line haul but poor in other 2 functions. • Shortlines can provide daily service, minimize car dwell time at the dock and cut out intermediate yards. • Railroads can be more truck-like with planning and discipline on both sides. MWARS 1/11/2006

  7. Why the Class Is use Shortlines • Gathering and distribution is shortlines’ forte; • Shortlines are closer to the smaller customers; • Shortlines are NOT the low-cost operator any more • Shortlines have 2-man crews as do Class Is • Shortlines lack the Class Is’ economies of scale in loco and track maintenance • Fuel costs the same or more MWARS 1/11/2006

  8. Shortline Economics • Shortlines get on average 20% or less of Class I line-haul revenue per car. • Class I average revenue per merchandise load US$1662 through October 31, 2005. • Shortline pro forma allowance US$250-$300 per revenue load. • Rule of 100: Need 100 revenue loads per route-mile per year to sustain 80 OR. MWARS 1/11/2006

  9. Shortline Consolidation • Bethlehem Steel roads to Lehigh Valley Rail Mgt., Georgia Pacific to GWR, Alcoa to RailAmerica • Consolidation among shortlines: RailNet to OmniTrax, Savage; Rail Management Group to GWR • Second-tier moves – Caney Fork & Western to Cundiff Group • Class Is wary of buyers over-paying MWARS 1/11/2006

  10. Shortline Realities • 60% of shortlines may not meet minimum economic thresholds for viability. • Exceptions: very short, single-purpose lines with high volumes. • Low-volume on a shortline indicates customers are using rail as a back-up or as a lever to keep truck rates in line. • The smaller the railroad the more demanding of Class I time and resources. MWARS 1/11/2006

  11. How to Tell a Value-Added Shortline - 1 • They’re busy, run six or seven days a week, have multiple crew-starts per day. • Everything is clean with a coat of paint. • Track is immaculate. • They’ll switch you the same time every day; “Train time is anytime” will not do. • They understand your supply chain and can help you make it run better and cheaper. MWARS 1/11/2006

  12. The V-A Shortline Measures Everything • Resources consumed (fuel, car hire, man-hours) per revenue unit; • Variation in Class I interchange times, drills down to root causes to minimize; • Financial performance (operating ratio, net margin) • Hours elapsed between interchange on and off; • Time between place and pull at your facility. MWARS 1/11/2006

  13. Signs of a Value-Added Shortline MWARS 1/11/2006

  14. How Customers Can Use the Value-Added Shortline to Their Advantage • As your advocate with the Class I – shortlines have contacts you don’t; • To pick the best option among routing choices; • To reality-check rate quotes; • By scheduling switch times to improve efficiency at your location – a daily appointment as with a truck; • To control floor inventory costs with scheduled transit times. MWARS 1/11/2006

  15. Rail Asset Management for Customers • Use shortline to manage empty car supply – COTS, LOGS, GCO. • Avoid demurrage with timely place and release – ask me about multiple car spots behind a closed gate. • Avoid Constructive Placement – it’s a sign that something isn’t working as it should. • Load and release by destination. • Pre-block for the distant node. MWARS 1/11/2006

  16. How Shortlines Maximize Value to their Connecting Class Is and thereby to Customers • Minimize equipment dwell time between interchanges. • Run unit trains on schedule to eliminate terminal delays and turn cars faster – lessees like this. • Run pre-blocked trains directly into Class I serving yard taking out Class I crew-starts and yard dwell. • Report car movement events in accordance with the established protocols. MWARS 1/11/2006

  17. In summary… • There are many sizes, shapes and approaches to the shortline business. • The good ones will grow; the others will go away. • Know which you’re dealing with – stop, look, listen. • Team up with your value-added shortline to lower the logistics portion of your Cost of Goods Sold. MWARS 1/11/2006

  18. Take-Aways • The value-added shortline is your advocate with the Class Is. • The value-added shortline creates a seamless network with the Class Is. • The only limit to what you can do with value-added shortlines is your own imagination. MWARS 1/11/2006

  19. Thanks For your kind attention. Now for the fun part… It’s Q&A time! MWARS 1/11/2006