An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hamilton County CCTV

  2. Overview of Design Concept • 63 Camera System • First System in Tennessee to Utilize Ethernet Protocols to Each Field Device • Field Hardened Routers • Leased T1 Lines • Dome Cameras • Demarcation Points • Layout of Temporary TMC

  3. Design Concept • 63 Camera System • Ethernet Protocol • Dome Cameras

  4. Design Concept • At each Demarcation Point • Field-hardened routers • Single and dual-camera demarcations • Routers could be configured to serve 2 cameras

  5. Design Concept • BellSouth provides leased T1 lines • TDOT Plans Future Fiber Backbone

  6. Design Concept • Layout of Temporary TMC • System Fully Equipped to Assist Incident Management

  7. Design Plans • Contract Let, Bid Awarded for $3.8 Million • Construction Began March 2006

  8. Considerations in Construction • Site Selection Factors • View from Camera • Constructability • Utility Service • Future Maintenance

  9. Considerations in Construction • Coordination with Other Agencies • City of Chattanooga • TVA • Avoid Conflicts Wherever Possible

  10. Considerations in Construction • Equipment • Technological Advances • Discontinued Equipment • Flexibility in Pole and Camera Configuration

  11. Considerations in Construction • Equipment (cont.) • Compatibility of Communication Protocols • Tech Involvement with Specified Equipment

  12. Considerations in Construction • Utility Coordination • Schedules for Placement & activation • Provisions for Future Costs/Financial Projections

  13. Considerations in Construction • Adjacent Project Impact • Environmental • EPSC QA/QC

  14. Considerations in Construction • TMC Coordination • Architectural Coordination • TMC Construction Contractor Coordination

  15. FINAL STAGES OF PROJECT • Conditional Acceptance: End of September • 6 month Burn In Period • Camera images will be available to public through TDOT’s website www.tdot.state.tn.us/tdotsmartway

  16. TDOT WEB PAGE

  17. QUESTIONS?