Roof Bevels for Oblique Hip and Skew Gable. This Slide Show is to be used to explain the methods of Geometrically Developing the bevels required for a Skew Gabled and Oblique Hipped Roof. Students are to complete their own drawings as the facilitator progresses through the show.
E N D
This Slide Show is to be used to explain the methods of Geometrically Developing the bevels required for a Skew Gabled and Oblique Hipped Roof. Students are to complete their own drawings as the facilitator progresses through the show
Identification of Main Aspects Plan Short Hip
Section 1.Draw Section Plan View
Plumb Bevel Common Rafter Level Bevel Common Rafter
Connect the 2 points L.L.1 3.Edge Bevel Creeper to Gable Rafter Measure up L..L.1 at 90o to top cord of section Develop it up to top cord of section L.L.1 Draw a Creeper in Plan View in any Position along Gable Rafter
Connect the 2 points LL2 Measure up L..L.2 at 90o to top cord of section 4.Edge Bevel Creeper to Long Hip Develop it up to top cord of section LL2 Draw a Creeper in Plan View in any Position along Long Hip
Connect the 2 points L.L.3 Measure up L..L.3 at 90o to top cord of section 5. Edge Bevel Creeper to Short Hip Develop it up to top cord of section L.L.3 Draw a Creeper in Plan View in any Position along Short Hip
Connect the 2 points Measure up L..L.4 at 90o to top cord of section 6.Edge bevel Crown end Rafter Develop it up to top cord of section Using you compass transfer the length on the Crown End rafter on to the Centring rafter Develop a line, in any position, at 90o to the Crown End Rafter and extend it to the Centring rafter This will become L.L.4
7. Plumb Bevel Gable Rafter 8. Level Bevel gable Rafter
9. Edge Bevel Gable Rafter Connect the 2 points Measure up L..L.5 at 90o to top cord of section Extend this line, still at 90o to the Skew Gable up to the top cord of the section Develop a line 90o to the skew gable to the ridge This will become L.L.5
10. Backing Angle Gable Rafter Develop a line 90o to the Top Cord and extend to the line of the Skew Gable Develop a line at 90o to the Skew Gable and extend until it intersects with the outside of the plan View Using your compass transfer the length of the first line onto the skew gable Connect the 2 points
Rise 11. Plumb Bevel Long Hip 12. Level Bevel Long Hip
Connect the 2 points Measure up L..L.6 at 90o to top cord of section 13. Edge bevel Long Hip Continue line up to Top Cord true length Hip Develop a line at 90o to the Long Hip Plan Length and extend to the Crown End Rafter this will become L.L.6
Rise 14. Plumb Bevel Short Hip 15. Level Bevel Short Hip
Connect the 2 points Measure up L..L.7 at 90o to top cord of section Continue line up to Top Cord true length Hip 16. Edge Bevel Short Hip Develop a line at 90o to the Short Hip Plan Length and extend to the Crown End Rafter this will become L.L.7
Develop a line at 90o to the top cord down to the bottom centre of the section Using your compass transfer the length of the original line to the bottom cord of the section From the intersection on the top Cord project the point down until it hits the Long Hip Then project this point down past the Centring Rafter From were the first projection meets the Long Hip develop a line parrel to the centring rafter until it meets the second projected line From this point develop a line back to the Gathering Point 17. Face Bevel Purlin to Long Hip
18. Edge Bevel Purlin to Long Hip This Angle is the opposite to Edge Bevel Creeper Long Hip (Development is as for Bevel 4)
19.Face Bevel Purlin to Gable Rafter Using Development for Bevel 17 From were the first projection meets the Gable develop a line parrel to the centring rafter until it meets the second projected line From this point develop a line back to the Gathering Point
20. Edge Bevel Purlin to Gable Rafter This Angle is the opposite to Edge Bevel Creeper to Gable Rafter (Development is as four bevel 3)
Develop a line at 90o to the top cord down to the bottom centre of the section From the intersection on the top Cord project the point down until it hits the Short Hip Using your compass transfer the length of the original line to the bottom cord of the section 21.Face Bevel Purlin to Short Hip Then project this point down past the Centring Rafter From were the first projection meets the Short Hip develop a line parrel to the centring rafter until it meets the second projected line From this point develop a line back to the Gathering Point
22. Edge Bevel Purlin to Short Hip This Angle is the opposite to Edge Bevel Creeper to Short Hip (Development is as four bevel 5)