1 / 14

PM 586 Final Exam (Latest) - Assignment

We understand your needs in exactly the same way you want us to. Get ready solutions to the latest exam papers and score the grades you have always dreamed of.

UOPeHelp
Download Presentation

PM 586 Final Exam (Latest) - Assignment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PM/586 Final Exam • Bywww.UopeHelp.com Copyright All Rights Reserved by http://www.uopehelp.com/

  2. 1. In a strong matrix structure, employees take daily direction from: • Project manager only • Both, but the project manager has greater influence • Both, but the functional manager has greater influence • Functional manager only 2. If the schedule variance is positive and the cost variance is negative, the project’s status is: • Over budget and behind schedule • Under budget and ahead of schedule • Over budget and ahead of schedule • Under budget and behind schedule 3. Which category of projects would involve a large number of functional units where the workers may be assigned either part-time or full-time? • Special • Individual • Staff • Matrixed Copyright All Rights Reserved by http://www.uopehelp.com/

  3. 4. Which type of chart provides the least “predictive” value? • PDM • ADM • PERT • Bar chart 5. Scope creep is generally the result of: • Too much detail in the specifications • Having too many levels in the WBS • Poorly defined SOW • Having the wrong people assigned to the project Find the final exam answers here click PM 586 Final Exam Latest Copyright All Rights Reserved by http://www.uopehelp.com/

  4. 6. Which of the following is the role of the PM rather than the role of the functional manager? • Where it will be done • How the work will be done • Who will do it • What work will be done 7. The balance between quality and cost is called: • Produceability • Salability • Availability • Operability 8. The EVMS term that represents the value of work actually accomplished is: • BAC • AC • EV • PV Copyright All Rights Reserved by http://www.uopehelp.com/

  5. 9. Which of the following would be the first item to be discussed in the initial kickoff meeting for a project? • Understanding of the budget • Understanding of the schedule • Understanding of the requirements • Understanding of the plan 10. Quality is defined by the: • Project team • customer • Project manager • Project sponsor Want to download the Complete Assignments of PM 586….?? Click PM 586 Complete Assignment Copyright All Rights Reserved by http://www.uopehelp.com/

  6. 11. Which of the following people has the greatest influence on how much authority a project manager will possess on a given project? • The project sponsor • The customer • The project manager’s line manager • The project manager himself / herself 12. A project manager desires a work breakdown structure that goes through 6 levels of detail. Level 3 through level 6 would most likely be prepared by: • Customer • Subject matter experts • Project manager • Project sponsor 13. In which project life cycle phase does quality begin? • Initiation / planning • Monitoring & control • Closure • Implementation Copyright All Rights Reserved by http://www.uopehelp.com/

  7. 14. Project management restructuring allowed companies to manage projects that _____. • Had undefined objectives • Could not be handled by the traditional organization • Did not require effective cost control • Require little functional integration 15. Risk constitutes a lack of knowledge _____. • Of future events • About the estimates • About the customer’s requirements • About the environment Want to see the answers of PM 586 Final Examination click…..?? PM 586 Final Examination Copyright All Rights Reserved by http://www.uopehelp.com/

  8. 16. The two primary components of a risk are: • The probability and the impact • The impact and the event • The impact and the amount at stake • The event and the probability 17. Which of the following standard project estimating techniques is usually accomplished in weeks? • Engineering • Parametric • Analogy • Grassroots 18. The hardest part in creating a best practices library is: • Storage • Classification • Evaluation • Knowledge transfer Copyright All Rights Reserved by http://www.uopehelp.com/

  9. 19. A typical project office (not to be confused with a project management office) responsible for the management of a large project includes the project manager and the: • Project sponsor and assistant project managers • Assistant project managers • Assistant project managers and functional managers • Project sponsor 20. Industries that have _____ tasks and operate in a _____ environment demonstrated the greatest need for project management. • Complex; Dynamic • Simple; Static • Complex; Static • Simple; Dynamic Click here to download the complete class of PM 586 Copyright All Rights Reserved by http://www.uopehelp.com/

  10. 21. Pricing out the construction cost of a home by a cost per square foot would be representative of a(n) _____ estimate. • Grassroots • Parametric • Engineering • Analogy 22. The collective term for the formal quality activities and processes is called: • Quality control • Quality visions • Quality assurance • Quality policies 23. The difference between the cost baseline and the contracted cost is the: • Profit • Management reserve • Cost of scope changes • Cost at completion Copyright All Rights Reserved by http://www.uopehelp.com/

  11. 24. Plans such as the cost plan, schedule plan and quality plan are referred to as: • Subsidiary plans • Specialized plans • Integration plans • Functional plans 25. Companies can become reasonably mature in project management by designing the right support systems. In general, how much time usually elapses after maturity before a company becomes excellent in project management execution? • 2 years • 1 year • 5 years • 10 years Final Exam Answers just a click away PM 586 Final Exam Answers Copyright All Rights Reserved by http://www.uopehelp.com/

  12. 26. The best source of revenue for a customer-requested scope change is: • A customer-funded contract amendment • Profits • Management reserve • Undistributed budget 27. During the 1970s and 1980s, formal project management practices were put in place because the constraints were _____ and _____ boundaries had to be crossed • Tight; few • Tight; several • Loose; few • Loose; several 28. A charting technique designed to illustrate the inductive and deductive reasoning necessary to achieve some objective is called a _____ Diagram / network • Descriptive • Intuition • Gantt • Logic Copyright All Rights Reserved by http://www.uopehelp.com/

  13. 29. Which of the following is often overlooked when planning and budgeting a project? • Customer’s milestones • Timing of the deliverables • Number of meetings with the customer • Cost and size of contractual documentation 30. What is the project sponsor’s responsibility with regard to the WBS preparation? • The sponsor should not be involved in WBS development. • Make sure all work packages are well-defined. • Make sure that the management levels of the WBS are correct. • Make sure that the technical levels of the WBS are correct. Copyright All Rights Reserved by http://www.uopehelp.com/

  14. About Author: This article covers the topic for the University of Phoenix PM 586 Final Exam (Latest). The author is working in the field of education from last 5 years. This article covers the questions & answers of PM 586 Complete Course from University of Phoenix. Other topics in the class are as follows: PM 586 Final Exam (Latest) Want to check other classes..?? Visit  http://www.uopehelp.com/ Copyright All Rights Reserved by http://www.uopehelp.com/

More Related