1 / 11

Geopulsar 2013

Pitch for Venture Investors and Business Angels

Download Presentation

Geopulsar 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sk Startup Village, Moscow, May 27, 2013 Free running explosive generator – source of pressure and temperature waves to increase the flow rate of oil wells and for geophysical survey Zufar Kamalov Geopulsar Ltd, Ufa, Russia Роль телевидения в современномоссийском обществе Доклад на тему «Такую-тои такую-то в 2 строки»

  2. Problems to solve: • low flow rates and fooding wells • 2) low recovery efficiency level– 1/3 in Russia • 3) insufficient availability of flow ratesenhancingservices 2 Mean yield of wells in Russia, kg/day, during 1980-2000

  3. Market demand: the oil loss due to 20-25K non-operational low flow rate wells are estimated at $5-10 billion a year only in Russia. Non-operationaloil wells in Russia Источник: журнал “Минеральные ресурсы России. Экономика и управление”, 3’2010 3

  4. Technical and market solution – Henry Ford way “Instead of looking for oil we need to find oil marketing”. Philip Kotler • Creating the new market niche of a low-cost self-servedcommon use unit to enhance the oil flow rate • Based on the free running, standard, reliable, flexible, easy-to-use source of pressure and temperature impulses (waves) • Project success promises revolutionary technology changes, reducing the application of water flood displacement that causes an unacceptable low recovery efficiency and contamination of groundwater aquifers 4

  5. Technical characteristics of unit • •Explosion energy–1-100 KJ. • • Pressure amplitude -till 350 atm. • • Number of impulses-not less 1K. • • Autonomic operating time – not less 12 months. • • Power -autonomic or feeding cable • • Controlling -MEMS based • • Operating depth - till 3 Km • • Weight- 100-200 Kg • • Height - 1000-2000 mm • Sizes in diameters - two types 5

  6. Wave source displacement in a well 1 – система управления и питания 2 – колонна НКТ 3 – обсадная колонна 4 –штанговый глубинный насос ШГН 5 – башмак НКТ 6 – акустический демпфер 7 – зона перфорации 8 – взрывной генератор 6

  7. Bench testing unit 1 – трубоотвод с краном 2 – кабель электропитания 3 – дозатор 4 – трубоотвод нагнетающий 5 – верхняя крышка 6 – газовая подушка 7 – взрывной генератор 8 – теплоизолятор 9 – рабочая среда 10 – отверстие для датчика 11 – камера 12 – трубопровод для слива 13 – пластина днища 14 – нагревательная плита 7 Роль телевидения в современномоссийском обществе Доклад на тему «Такую-тои такую-то в 2 строки»

  8. Estimated market demand and profits per year (Russia only) 30 K units to arrange 50% of non-operating and low flow rates wells Cost of production - $15 K, price $30 K per unit Producer’s additional EBITDA -$600 mln. Additional income of user – $ 50K– 250 K per well (unit) at price $100/barrel Additional income of oil industry - $1,5 bln - 7,5 bln. 8

  9. Geopulsar Team 1. Zufar Kamalov,1956, Ph.D., director, project evangelist. Inventor, MIPT “Fiztech” background, 10 years experience in innovation projects consulting 2. Rinal Gataullin,1991, executive director. Bashkir State University, Geophysics Masters Courses, FASIE UMNIK granted, 2 years experience as director of Innovation Service Ltd 3. Vladimir Sloboda,1947, main designer. Inventor, highly qualified and well experienced person 4. Prof. Oleg Darintsev,1967, project consultant, highly qualified in MEMS, robotics 5. Dmitriy Pakaev,1991, researcher, Bashkir State University, Geophysics Masters Courses, FASIE UMNIK granted 9

  10. To design and test pilot unit in 3 years project needs: Venture Investing $600-700 K per year HR, marketing and technological partnership 10

  11. Thank you for attention! Zufar Kamalov, Geopulsar Ltd, director e-mail:ZGK @ ANRB.RU, zufar.kamalov@gmail.com Skype: zufar.kamalov mobile: +7 917 340 9848 Fax: +(347) 229 9611 11

More Related