Tevatron progress: May’03 to Aug’03

Tevatron progress: May’03 to Aug’03. Luminosity: (average initial peak L ) mid-May (6 stores #2538-2555) L =42.8 End of July (5 stores #2815-2826) L =40.1 6% drop in peak luminosity: +3% in protons,+3% in pbars,-12% in emmittance (blown)

aaralyn
Download Presentation

Tevatron progress: May’03 to Aug’03

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tevatron progress: May’03 to Aug’03 • Luminosity: (average initial peak L) • mid-May (6 stores #2538-2555) L=42.8 • End of July (5 stores #2815-2826) L=40.1 • 6% drop in peak luminosity: • +3% in protons,+3% in pbars,-12% in emmittance (blown) • record L as of May.30 44.9e30 store #2555 record L as of Aug.8 45.3e30 store #2824 • lifetimes of N_p, N_pbar somewhat worse , L ~the same, eff-emittance lifetime improved (1927hrs)

  2. Operations/Reliability: • 9.7 pb-1/week (record), July 21-27 • helpful operational orbit smoothing (CYTan) • Differential chromaticity reduced  luminosity(Yuri) • Lower inj energy for pbars  efficiency (Bruce) • various problems with RF system (3 stores) • TEL HV modulator repair – 16 hrs access • collimators control (1 store) – fixed (Dean) • PSs trips – too frequent, A2A3 change • flaws with C49 tables reloading (doubled lines) • large pbar losses on ramp, regular “scallops”, P10 unstable after seq.25

  3. Tevatron Beam Physics Progress: • Lattice measurements (Valeri, Petr) reveal -drifts • Ring wide aperture and dQ scans (Yuri, +) • S6 sextupole detuning, diff Chroma fixed (YA, +) • V4YA ramp helix in process (Yuri, Ron, Jerry, +) • Pbar b-by-b orbits as in model (TSen) • 1 unit b_0 drift observed at MTF (PBauer) • 5* injection helix – set aside • not much progress with emittance at inj

  4. Tevatron Diagnostics: • Progress with new Schottky for Qv,h ,Cv,h,emm(AJ,JS,RP) • QXR quads tested with beam (Andreas) • Cv,h from “tunefitter” progress >½ done (Paul) • Interesting results with Ekotech BPMs (Webber, Sheppert) • SBDP(A)IS calibrated to1% (Alvin, Bob Flora) • Slow progress in understanding SL/FW/Collim (AJ,JS,SP)

  5. Misc. : • Passed DoE review with ~B mark (many people) • Shutdown work reviews: A48 (Ron, Wolff), F0 (PeterI,JimV,Jerry), Alignment (Ray, PeterG) • Letters of Recognition: Ranjbar, Alexahin, Hanna • New BPM project launched (JimS, Steven Wolbers) • Upgrade of beam studies Web page – again! (Dean) • Tough situation with time for studies, need to show discipline and progress, McGinnis approach

  6. Next Two Months: • Operation/Maintenance: • Install, commission inj-dampers (JimS, Tan) • Finish preparations and start 7(10)wk shutdown: • F0 liner (Peter, Jim Volk) • A48 (Ron) • Alignment: rolls, quads, stands, smart bolts, HLSs (Ray,J V) • Vacuum (Bruce) – to be reviewed • CDF shield wall (JimV) – to be reviewed • Rewire octupoles (BPhys, Petr, Jerry) – decide upon details • Beam studies before shutdown: • New helix  reduce loss on ramp (Yuri, +) • Emm at injection (Tev, beamlines) (DaveJ,Val,JA) • Studies which may affect shutdown work • Lattice, diagnostics (C_v,h), etc

  7. Next Two Months (cont’d): • Diagnostics: • Tev BMP review by Oct 1(JimS) • Tev IPM review by Oct.1 (Andreas) • Cv,h and coupling from tunefitter (Paul L) • Cv,h Qv,h and coupling from head-tail (Vahid) • Pbar tunes from old Schottky (Markus, Paul L) • Abort gap monitor (H.Cheung) • Continue on SL vs FW vs coll (AJ, JS, Stephen) • Misc: • New helix/separators review in Aug (Ron) • BBC with wires review in Sep (Tanaji)

  8. Next Two Months: Expectations • Last time it was “… we are around 45-51 by Aug 1” - we are at 45.3e30 • Over next 2-2½ months, I expect: • shutdown to start Sep 8 • we will get 225 pb-1 over FY’03 • possible improvements • 5-10% more p and pbars due to new helix commissioning • As the result, I expect we’ll be around 45-51e30 by Sep.8, 2003