An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the ARIBE project L. Maunoury, B. Huber, T.Been, P. Guinement, H. Lebius, B. Manil, J.M. Ramillon L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  2. The ARIBE facility ARIBE : Accélérateurs pour les Recherches interdisciplinaires avec les Ions de Basse Energie ARIBE is the result of the combination of the AIM facility (Grenoble) and the LIMBE facility (Caen) Goals : ==> high performance infrastructure for providing low energy beams (1V - 25 kV) ==> creation of an international research area on the Physics of low energy ions The ARIBE facility will be composed of three types of beam lines : ==> Medium Energy Beam Line : MEBL ( = 6 beam lines) ==> Low Energy Beam Line : LEBL ( = 1 beam line) ==> Cluster Beam Line (future development) : CLBL Thus, the main characteristics of this infrastructure will be :  Intense beams of highly charged ions from keV up to MeV  Mono-energetic highly charged ions at eV energies  Cluster beams in the eV to keV energie range (future development) L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  3. Actually : LIMBE The ECR ion source SUPERSHYPIE  14.5 GHz high frequency microwave and up to 1 kW of power  Coils and permanent magnets for the magnetic field structure  Mono-gap extraction  Energy range : 1.5 - 25 keV/q L. Maunoury et al., LIMBE : a new facility for low energy beams, Review of Scientific Instrument, Vol 73, Num 2, 2002 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  4. First step: implementation of the LEBL beam line L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  5. CAPRICE ECR ion source The deceleration system = LEBL + For more details ==> H. Lebius et al., Highly charged ion beams at eV kinetic energies, Review of Scientific Instrument, Vol 74, Num 4, 2003 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  6. Sketch of the LEBL 2m 2m A. Chellois JM Ramillon L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  7. Second step : construction of a new building Extension 180 m2 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  8. L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  9. The new additional MEBL beam lines L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  10. Sketch of the additional beam lines A. Chellois JM Ramillon L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  11. The last step : final version of the project L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland

  12. The actual schedule of the project Total cost of the project ==> 535 k€ This cost will be supported by CEA (17.8%) , CNRS (17.8%), Region of Basse Normandie (33.6%) and FEDER (30.8%) Schedule of the project Installation of the LEBL beam line ==> January 2003 to April 2004 First beam expected for May 2004 Building ==> July 2003 to end of June 2004 Installation of the MEBL additional beam line ==> June 2004 to December 2004 First beam expected for the end of December 2004 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland