Status of the ARIBE project. L. Maunoury, B. Huber, T.Been, P. Guinement, H. Lebius, B. Manil, J.M. Ramillon. L. Maunoury. 4 rd Annual LEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland. The ARIBE facility.
E N D
Status of the ARIBE project L. Maunoury, B. Huber, T.Been, P. Guinement, H. Lebius, B. Manil, J.M. Ramillon L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
The ARIBE facility ARIBE : Accélérateurs pour les Recherches interdisciplinaires avec les Ions de Basse Energie ARIBE is the result of the combination of the AIM facility (Grenoble) and the LIMBE facility (Caen) Goals : ==> high performance infrastructure for providing low energy beams (1V - 25 kV) ==> creation of an international research area on the Physics of low energy ions The ARIBE facility will be composed of three types of beam lines : ==> Medium Energy Beam Line : MEBL ( = 6 beam lines) ==> Low Energy Beam Line : LEBL ( = 1 beam line) ==> Cluster Beam Line (future development) : CLBL Thus, the main characteristics of this infrastructure will be : Intense beams of highly charged ions from keV up to MeV Mono-energetic highly charged ions at eV energies Cluster beams in the eV to keV energie range (future development) L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
Actually : LIMBE The ECR ion source SUPERSHYPIE 14.5 GHz high frequency microwave and up to 1 kW of power Coils and permanent magnets for the magnetic field structure Mono-gap extraction Energy range : 1.5 - 25 keV/q L. Maunoury et al., LIMBE : a new facility for low energy beams, Review of Scientific Instrument, Vol 73, Num 2, 2002 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
First step: implementation of the LEBL beam line L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
CAPRICE ECR ion source The deceleration system = LEBL + For more details ==> H. Lebius et al., Highly charged ion beams at eV kinetic energies, Review of Scientific Instrument, Vol 74, Num 4, 2003 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
Sketch of the LEBL 2m 2m A. Chellois JM Ramillon L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
Second step : construction of a new building Extension 180 m2 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
The new additional MEBL beam lines L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
Sketch of the additional beam lines A. Chellois JM Ramillon L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
The last step : final version of the project L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland
The actual schedule of the project Total cost of the project ==> 535 k€ This cost will be supported by CEA (17.8%) , CNRS (17.8%), Region of Basse Normandie (33.6%) and FEDER (30.8%) Schedule of the project Installation of the LEBL beam line ==> January 2003 to April 2004 First beam expected for May 2004 Building ==> July 2003 to end of June 2004 Installation of the MEBL additional beam line ==> June 2004 to December 2004 First beam expected for the end of December 2004 L. Maunoury 4rd AnnualLEIF Meeting June 27th - July 2rd 2003, Belfast, Ireland