1 / 10

Team Implementation Checklist TIC

Team Implementation Checklist Rationale. The Team Implementation Checklist (TIC) is designed to monitor the activities of implementation of seven critical features of PBSThe TIC measures:Establishment of commitmentEstablishment and maintenance of a teamSelf-assessmentEstablish School-Wide Expec

abbott
Download Presentation

Team Implementation Checklist TIC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Team Implementation Checklist TIC Version 3.0 www.pbssurveys.org

    2. Team Implementation Checklist Rationale The Team Implementation Checklist (TIC) is designed to monitor the activities of implementation of seven critical features of PBS The TIC measures: Establishment of commitment Establishment and maintenance of a team Self-assessment Establish School-Wide Expectations: Prevention Systems Classroom Behavior Support Systems Establishment of an Information System Capacity for Function-Based Support Track over time progress of the 7 features of PBIS Best practice back to the components of PBIS Track over time progress of the 7 features of PBIS Best practice back to the components of PBIS

    3. TIC Rationale The Team Implementation Checklist is designed as a “progress monitoring” tool for school teams implementing Universal PBIS elements. The TIC should be completed by the full team (preferable with the district coach). Information from the TIC should be used to guide development of an action plan. The TIC typically is completed each month (or every other month) until a team rates 80% of the TIC items as “Achieved” for three consecutive administrations.  

    4. Scroll down for printablesScroll down for printables

More Related