1 / 16

WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog Frank Thorenz Holger Blum NLWK Norden. Overview. Timetable 12.05.2004. Timetable 13.05.2004. Langeoog arial photo. Langeoog - Western part. Langeoog Impressions 1. Langeoog Impressions 2.

abbott
Download Presentation

WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog Frank Thorenz Holger Blum NLWK Norden

  2. Overview

  3. Timetable 12.05.2004

  4. Timetable 13.05.2004

  5. Langeoog arial photo

  6. Langeoog - Western part

  7. Langeoog Impressions 1

  8. Langeoog Impressions 2

  9. Langeoog - Topography Basic Data for DTM: LIDAR Survey 1999

  10. Coatal defence system Protective dunes Freshwater catchment area Summer dyke Groynes Main dyke

  11. Freshwater lens Quelle: OOWV

  12. Pirolatal Dune 1999

  13. Pirolatal Dune 2000

  14. Pirolatal Dune 2001

  15. Pirolatal Dune 2003

  16. Dune reinforcement

More Related