1 / 10

Project of sewage system optimisation of the City of Koprivnica

Project of sewage system optimisation of the City of Koprivnica. City of Koprivnica. Centre of Koprivnica-Križevci county 31.000 inhabitants Relatively big industrial companies - Podravka, Carlsberg, Hartman, Danica, Belupo. Existing state of the sewage system of the City of Koprivnica.

abel-franco
Download Presentation

Project of sewage system optimisation of the City of Koprivnica

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project ofsewage system optimisation of the City of Koprivnica

  2. City of Koprivnica • Centre of Koprivnica-Križevci county • 31.000 inhabitants • Relatively big industrial companies - Podravka, Carlsberg, Hartman, Danica, Belupo

  3. Existing state of the sewage system of the City of Koprivnica • Beginnings of system construction 100 years ago • Today’s situation: - 186 km of sewage system network - 5 re-pump stations - 21 km of main collectors - main accumulating collector (2,5 km) - Chemical – biological plant for waste water treatment • System management – GKP Komunalac Koprivnica

  4. System expansion dynamics • Last 5 – 6 years: - intensive construction (cca 8-12 km of new or re-constructed sewage) - annual investments of the city: cca 1-2 mil. € for sewage network (construction and reconstruction) - construction of main accumulating collector receiving all waste waters from the city area - construction of biological waste water treatment plant

  5. Problems of existing system • Intensive expansion and reconstruction of the network • Within construction and reconstruction of the network problem area of the system in construction area was assessed • Partial network expansion and system interventions

  6. Why sewage system optimisation? • Major preconditions for system completion sre created (main accumulating collector and chemical-biological treatment plant) • Continuation of network expansion and reconstruction is planned in the same intensity. • Evaluation of the existing system and elaboration of guidelines for dynamics and technical aspects for further investments in the system are needed

  7. Objectives of sewage system optimisation project • Defining technical parameters of existing situation • Elaboration of data bases • Defining drawbacks of the existing system • Defining needs and priorities for interventions on the existing system

  8. Analysis and proposal of preliminary concept for further network expansion • Defining technical parameters of further expansion of the system • Elaboration of optimum sequence of network expansion

  9. Expected benefits and results • Systemized and optimized access to future interventions on network and network expansion • Optimisation of future investments • Improved solution of system completion and work • Improved management of the system and of water protection scheme

  10. Thank you for your attention www.koprivnica.hr

More Related