Implementation of Darwin – ME Chris Wagner, PE July 26-29, 2010 Kansas City, MO
Does SHA Use or Plan to Use MEPDG? N0 -12 YES - 40 Alaska Hawaii 2007 Survey
State implementation activities • Validation Activities • Status of DARWin ME • Planned Activites for DARWin ME
Software Capabilities-Import Raw Data Climate: icm files Traffic: AHTD Traffic Monitoring Data 5
Software Capabilities- Retrieving Data Very similar tools will be included in DARWin ME 8
Indiana DOT HMA Materials Characterization • Dynamic Modulus • District - 6 • Nom Max Aggregate Size - 3 • Binder Type – 3 • Binder Characterization • 3 Binders DSR data • Traffic Data • WIM Station Data Analyzed • Load Spectra defined by Volume
Sensitivity of Inputs for Concrete What to Change for Design? Indiana DOT: MEPDG Guide for Designers
Good Calibration and Implementation Document • Montana DOT • http://www.mdt.mt.gov/research/projects/pave/pave_model.shtml • Major Findings: • Preservation Practice Extend Performance • Most models adequate for design • Re-calibrate unbound materials rutting
at Auburn University Continued MEPDG Validation
at Auburn University S11– As Built – Fatigue Cracking
at Auburn University Continued Validation
at Auburn University Looking at Strains Directly Strain Response
at Auburn University Darwin-ME output
DARWin ME — Improvements • Redesign GUI using .NET 3.5 framework in C# • User configurable screens • Agency defined data libraries • Input control at the central office • Expansion capabilities for new analysis engines • Improved display on large or multiple monitors • Improved error handling stability and error display • Multiple project editing • Handicap accessibility options • Improved reporting (stability, speed and quality) • Utilities for importing previous version files, third party data • Multiple language extensibility
DARWin ME planned activities • Unveiling Session at 2011 TRB • Roll out webinar • FHWA web training 2011 • FHWA On-site training • Traffic Workshops
Indiana DOT Experience Total Estimated Savings = $10 Million
Evolution • The MEPDG is not perfect…..BUT; • The MEPDG provides a reasonable and structured platform for continuous improvement.