An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Off-corridor Habitat Enhancement PMH1 IAERC November 25, 2009

  2. PMH1 Off-Corridor Habitat Enhancement: • Review and current status on PMH1 off-corridor habitat works • Brae Slough – Implementation • Mundy Creek – Implementation • Wilson Farm – Concept

  3. Brae Island Implementation – Schedule Overview

  4. Brae Slough Implementation: Straw Placement September 29, 2009: Covering exposed channel slopes with straw

  5. Brae Slough Implementation: Amphibian Salvage October 2, 2009: Long toed salamander salvaged.

  6. Brae Slough Implementation: Glover Pond – Placing root wad October 6, 2009 – Placing cottonwood LWD in Glover Road Pond

  7. Brae Slough Implementation: In-line pond October 8, 2009 - Completed in-line pond, with LWD complexing.

  8. Brae Slough Implementation: Planting November 3, 2009: Willow cuttings and planted stock along riparian bench

  9. Brae Slough: November 3, 2009 – View of Brae slough enhancement from Glover Road

  10. Mundy Creek Implementation • Excavation complete for loop channel. • LWD placement on loop channel complete. • Riparian planting on north leg of channel loop (primarily hardhack and salmonberry) complete. • Excavation of the channel extension has been initiated but not complete pending approvalfrom the utilities and regulatory agencies. • Hydraulic connection anticipated for summer 2010.

  11. Mundy Creek - Implementation Excavation has been undertaken to ensure the channel and banks are roughly textured leaving a high proportion of overlying organic soil in place to provide an organic growing medium for plants.

  12. Mundy Creek – LWD Placement Wood debris placement along north arm of channel looking west.

  13. Mundy Creek Implementation: Complexing Tree stem anchoring. Cable attached to eye cemented in to buried boulder

  14. Mundy Creek Implementation: Complexing October 8, 2009: Preparing anchor boulders.

  15. Mundy Creek Implementation: Planting North leg showing planting densities. Planks placed to provide access across channel for planting crew.

  16. Mundy Creek Implementation: Planting North leg of channel looking west showing woody debris placement and riparian planting

  17. Wilson Farm Concept Development – Schedule Overview