100 likes | 208 Views
Review goals . N. Catalan Lasheras BE/RF. Agenda. Goals. Make a post-mortem analysis of the full process Identify technical problems that need to be addressed Propose a solution Suggest small changes for cost/time saving Decide on the future strategy Second prototype? Final production?.
E N D
Review goals N. Catalan Lasheras BE/RF
Goals • Make a post-mortem analysis of the full process • Identify technical problems that need to be addressed • Propose a solution • Suggest small changes for cost/time saving • Decide on the future strategy • Second prototype? • Final production?
Budget • Materials is dominated by copper 6.7kCHF • NRE : Drawings plus engineering support • Possible to make for 50-60k?
Schedule More than a year work Some delays could have been avoided Possible to make a second one in 6 months?
Flanges • Coating of flanges • CERN coating does not fulfil specifications • External work required. Two months delay • Wrong flanges used • Need to modify a ”Germana” type flange
Brazing the cooling jacket Largest technical issue Consequences on brazing time, and water circuit leak More to come…
Assembly • Missing small components: • Screws, goupilles, etc. • Not critical. Not mayor delay • Can be easily solved • Non obvious assembly • More from Raphael, Jan • Support • Wrong direction. Easily solvable
All in all a great achievement from everybody. It works, is beautiful… A pleasure to work with you And I learned a couple of things in the way… Thank you!!