100 likes | 262 Views
NOC/Engineering Meeting. Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru: Design of JP-KR GbE Network(JP side) Jaehwa Lee: Design of KR-JP GbE Network(KR side)
E N D
NOC/Engineering Meeting • Date & Time: 12:00 - 13:00 over Lunch • 13:40 - 15:00 at Lotus Hall 1 • Yoshinori Kitatsuji: APAN-JP NOC Report & Plan • Masaki Hirabaru: Design of JP-KR GbE Network(JP side) • Jaehwa Lee: Design of KR-JP GbE Network(KR side) • John Hicks: Abilene Upgrade
South East Asia Hub • Sures and Royol will write the South East Asia Hub and its sites/projects. Done! • Yong-Jin Park will submit the intra-Asia network proposal to Asia Backbone Planning Committee today, and Sures & Royol’s document will be attached. may be done!
APAN-JP Traffic TransPAC-north JP-Taiwan JP-China
APII/Genkai Existing CRL e! Busan XP Tokyo XP APII / Genkai Network (JP side)August 27, 2002 2.4 GbpsSONET JGN Tenjin(NTT Com) Genkai XP (Meinohama) DATAX uZ2.4G-GEB 600M ATM Kyushu & Yamaguchi 2 x GbE 600M ATM (DF) 17km APII/GenkaiServers JuniperM10 ATOMIS 5 ATOMIS 7 600M ATM GbE GbE 600M ATM 150M ATM(Backup) JGN GbE JuniperM10 e! Servers Kyushu & Yamaguchi(QGPOP) ATOMIS 7 L2 150M ATM GbE cisco GbE (DF) L2 JuniperM10 Genkai SINET GbE (DF) GbE GbE Kyushu U Genkai
Taejon Suwon Taegu Seoul KREONet2 Renater 2 SingAREN KREONet2 KREONet2 KREONet2 KREONet2 APII GbE (KR Side) KIX Seoul XP Tokyo XP Members with 1GbE access link STAR TAP Kwangju Pusan 10G 2.4G 1GbE to members JP-KR Connection From Fukuoka
Abilene Upgrade by mid September • Abilene will have upgraded 10 core nodes (Indy and Chicago are finished). • The Atlanta node is scheduled for December. • The Cleveland node is going away. • Each node will be configured with a Juniper T640 • The GSRs will remain for the time being.
Reference Presentation materials will be downloaded from http://www.jp.apan.net/