An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proton DriverProject Development,Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004 G.W.Foster - Proton Driver

  2. This is supposed to be a non-technical talk … I’ll do my best…. G.W.Foster - Proton Driver

  3. Some Developments • 1st Round of PD Design Studies Completed • PD Recommendation by FLRPC • New Design Iteration Started • Goal: CD-0 Documentation by End of ’04 • Both Synchrotron and SCRF Linac (emphasized) • US SCRF Collaboration enthusiasm for PD • ITRP Decision Pending G.W.Foster - Proton Driver

  4. Proton Driver Synchrotron & Linac • SYNCHROTRON • Sited West of the existing booster • Re-uses existing linac enclosure • 8 GeV LINAC • Baseline Site injects at MI-30 straight section • Others possible G.W.Foster - Proton Driver

  5. Q: WHAT IS THE SIGNIFICANCE OF THIS NUMBER ? A: this is the number of vacuum tubes required to accelerate beams to 8 GeV in Fermilab’s current Proton Source. 451 G.W.Foster - Proton Driver

  6. 8 GeV Superconducting Linac • New idea incorporating concepts from both the Spallation Neutron Source (SNS) and TESLA. • Copy SNS Linac design up to 1.3 GeV • Use “TESLA” Cryomodules from 1.3 -8 GeV • H- Injection at 8 GeV in Main Injector ==> “Super-Beams” in Fermilab Main Injector: • 2 MW Beam power at BOTH 8 GeV and 120 GeV • Small emittances ==> Small losses in Main Injector • Minimum (1.5 sec) cycle time • MI Beam Power Independent of Beam Energy ==> (flexible neutrino program) G.W.Foster - Proton Driver

  7. 8 GeV Superconducting LinacWith X-Ray FEL, 8 GeV Neutrino & Spallation Sources, LC and Neutrino Factory Neutrino “Super- Beams” SY-120 Fixed-Target Damping Rings for TESLA @ FNAL With 8 GeV e+ Preacc. NUMI Off- Axis X-RAY FEL LAB 8 GeV neutrino 8 GeV Linac ~ 700m Active Length 1% LC Systems Test Main Injector @2 MW Bunching Ring Target and Muon Cooling Channel Recirculating Linac for Neutrino Factory Neutrino Target & Long-Pulse Spallation Source Short Baseline Detector Array VLHC at Fermilab Neutrinos to “Homestake” Anti- Proton G.W.Foster - Proton Driver

  8. 8 GeV SC Linac Proton Driver • A Bridge Program to the Linear Collider • Near Term Physics Program (neutrinos+) • Multiple HEP Destinations & Off-Ramps • A seed project for Industrial Participation 50 cryomodules, 12 RF stations, ~1.5% of LC G.W.Foster - Proton Driver

  9. New Proton Driver Charge Letter G.W.Foster - Proton Driver

  10. Proton Driver Charge (machine) • Goal: CD-0 Documentation by End of ’04 • Both Synchrotron and SCRF Linac (emphasized) • Common Performance Specs and Cost Basis • External Review of Accelerator Physics • Investigation of Outside Collaboration G.W.Foster - Proton Driver

  11. PD Work in Progress … • Weekly meetings in specific technical areas (four) • Visits from experts • Prototype key components • Develop Collaborations G.W.Foster - Proton Driver

  12. Linac Technical Strategy • TESLA compatible frequency chosen • Prototypes & vendors exist for 7/8 of linac • Complete overlap with LC test facility • Staging Stand-Alone Linac Beam Power • Cut Klystron count from 42  12 • Preserve 2 MW beam power in MI • Adopt “Pulsed RIA” SCRF front end G.W.Foster - Proton Driver

  13. Cost Driver: Klystrons per GeV G.W.Foster - Proton Driver

  14. 0.5 MW with TESLA Frequencies & SCRF F.E. G.W.Foster - Proton Driver

  15. COLLABORATION • Will be key to the success of • the SCRF Proton Driver • the LC test facility … and can speed up both if they are the same project. G.W.Foster - Proton Driver

  16. G.W.Foster - Proton Driver

  17. JHF 325 MHz RFQ and Klystrons for TESLA-Compatible* Front End JHF 325 MHz RF Quad JHF 325 MHz 3 MW Klystron * TESLA frequency = 1300 MHz = 4*325 MHz G.W.Foster - Proton Driver

  18. LANL (APT) ANL (RIA) G.W.Foster - Proton Driver

  19. End-to-End Beam Physicsof TESLA-Compatible Linac(P. Ostroumov, ANL) G.W.Foster - Proton Driver

  20. 8 GeV Superconducting LinacTECHNICAL SUBSYSTEM DESIGNS EXIST AND WORK FNAL/TTF Modulators SNS Cavites (JLAB) “TTF Style” Cryomodules Civil Const. Based on FMI TESLA RF Distribution * w/ phase shifters G.W.Foster - Proton Driver

  21. Advanced RF Distribution(Coaxial Phase Shifter Option) RF FROM KLYSTRON DIRECTIONAL COUPLER (POWER SPLIT) CIRCULATOR AND LOAD COAXIAL FERRITE STUB TUNER AND WAVEGUIDE TRANSITION / E MAGIC TEE AND CAVITY RF POWER COUPLER YET! G.W.Foster - Proton Driver

  22. THE NEXT STEP • There is a 100% overlap in the plans for the next step of the SCRF Proton Driver and the SCRF Linear Collider: Set up 1 GeV of TESLA linac • At Fermilab • With as many US-built components as possible G.W.Foster - Proton Driver

  23. Fermilab’s Assets M-East And M-P Beamlines MESON AREA CRYOGENICS • Cryogenics • Beamlines • Near-term project: SCRF Proton Driver MESON CRYO PLANT TRANSFER LINES Immediate Support for (1) TESLA RF Station and (4) TESLA Cryomodules G.W.Foster - Proton Driver

  24. Recognize the Handwriting? cryomodules time Helen Edwards G.W.Foster - Proton Driver

  25. Final Questions • Is the LC / PD decision point 2008? • Impact of LC Technology decision • on collaboration • on US HEP • Funding Profile & Schedule depending on whether BTeV does / does not survive reviews… G.W.Foster - Proton Driver