NEI SMR UK Summit

NEI SMR UK Summit. 20 th October 2015 Paul Harding U-Battery. U-Battery: Part of the solution. A local source of heat (800 degrees C) and electricity. Single unit is 10MWt, 4MWe.

achurchill
Download Presentation

NEI SMR UK Summit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEI SMR UK Summit 20th October 2015 Paul Harding U-Battery

  2. U-Battery: Part of the solution • A local source of heat (800 degrees C) and electricity. • Single unit is 10MWt, 4MWe. • Powered by inherently safe TRISO fuel (ceramic coated uranium dioxide granules embedded in a graphite matrix). • Helium coolant in primary circuit. • Nitrogen in secondary circuit driving gas turbine/generator set – direct Brayton Cycle. • Occupies volume of 2 squash courts – footprint equivalent to penalty area on football pitch.

  3. Development Consortium Leading Members Supporting Members

  4. Project Development

  5. Phasing of Project Phase 1 • Mid 2015 to Mid 2017. • £16M. • Basic design. • Refinement of cost estimate. • Preliminary regulatory submissions. Phases 2 and 3 • 2018 to 2023. • £18M design and licensing. • £100M hardware. • Detailed design. • Procurement and manufacture. • Licensing application and approval. • Construction, installation, testing, commissioning. • Operation.

  6. Two independent market studies commissioned by URENCO • Collinson Grant 2014 (UK and Global) • Aurora 2015 (UK )

  7. Projected market

  8. 1DECC’s Electricity Market Reform: Contract for Difference – Allocation Methodology for Renewable Generation (Aug 2013) On-grid A £72 CfD compares favourably to other low-carbon technologies, and is lower than offshore wind in 2020 Administrative strike prices, £/MWh (2015) U-battery required CfD £72/MWh Energy from waste with CHP Solar PV (>5MW) Offshore wind Offshore wind 2020 Hinkley point C Onshore wind

  9. Current Key Work

  10. Recent Progress • Incorporating JV Company in UK • Concept Design for fuelling/refuelling • Engaged with URENCO UK for FOAK siting and licensing