An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Florida Inland Navigation District: Permitting and Construction of the M-5 Island Offloading & Crossroads Maintenance Dredging and the NA-1 Upland DMMA Facility Authored by Lori Brownell, P.E. and John Adams, P.E. Presented by Jim Marino, P.E., D.CE October 2012

  2. PresentationOverview • Long-Range Planning Efforts for Florida • General Dredged Material Management Plan • Florida’s Intracoastal Waterway • Florida’s Okeechobee Waterway • Permitting Challenges in Florida • M-5 Island Offloading and Crossroads Maintenance Dredging • NA-1 Dredged Material Management Area Construction

  3. Long-Range Planning Efforts for Florida • Florida Inland Navigation District (FIND) established in 1927 • Shifts in perception occurred in mid-1980s regarding dredging/dredged material management • Taylor Engineering became the District Engineer in 1986 • Dredged Material Management Plan development guided by • Technical advisory committee • Citizens’ advisory committee • 12 county-specific plans • Two-phased approach

  4. Florida’s Intracoastal Waterway • 404 channel miles within two federally-authorized navigation projects • Constructed to present depths 1941 – 1961 • Environmentally diverse • Multibillion-dollar economic impact • 16 tidal entrances • 5 deep-water ports • 60 placement sites • 8 beach • 52 confined upland placement sites • 31 properties acquired • 18 operational • 1 final design/permitting • 2 under construction

  5. Florida’s Okeechobee Waterway • Expanding FIND’s DMMP • 1996 and 2005 legislation added 98 channel miles (4 segments) • FIND total – 502 channel miles • Fundamental differences between ICWW and OWW • Initially authorized and constructed for flood control/water distribution • No history of channel maintenance • Variation in lake levels • Active phosphorus load reduction effort

  6. DMMP Permitting Challenges in Florida • DMMP Purpose: Assist the USACE with dredging operations in a manner dictated by economic and engineering considerations, and environmental and socioeconomic constraints • Economic and engineering considerations • Dredged Material Placement Areas (DMMAs) • Material locations (shoals) • Material volumes (cubic yards [cy]) • Material types (sand, clay, silt) • Environmental and socioeconomic constraints • Natural resources • Threatened and endangered species • Cultural resources • Adjacent land use and zoning restrictions

  7. M-5 Island Offloading & Crossroads Maintenance Dredging • Economic and engineering considerations • Island dredge material management area • Diverse and challenging wind and wave conditions • Tight beach compliance criteria • Environmental and socioeconomic constraints • Adjacent aquatic water preserve • Active least tern and sea turtle nesting areas • Offshore hardbottom • Multiagency coordination – County, FDEP, USACE, NMFS, National Wildlife Refuge • Adjacent land use and zoning restrictions

  8. Project Overview • Repeat Taylor Engineering project • 1997 = 625,000 cy at M-SLI A and M-SLI B • ICWW pipeline corridor • Fundamental differences • 1997 = DMMA construction • 2012 = 350,000 cy between R59 and R80 • Increased environmental scrutiny • Beach pipeline corridor • Crossroads Maintenance Dredging • ICWW and OWW intersection • 2 – 3 year dredging cycle • 50,000 – 60,000 CY/dredging cycle • M-5 DMMA Placement

  9. M-5 DMMA • M-5 capacity: 290,000 cy (4 – 6-yr dredging cycles) • Intermodal area challenges • Federal channel • Wind and wave forces • Gabions • Adequate navigation depth • Seagrass • Mangroves

  10. Pipeline Corridor • Pipeline route • Martin County easement • Beach design challenges • St. Lucie Inlet State Park • Hobe Sound National Wildlife Refuge • St. Lucie Aquatic Preserve OFW • Vicinity of hardbottom • Sea turtles

  11. NA-1 Dredged Material Management Area • Economic and engineering considerations • Variable subsurface soil conditions • Installation of wick drains • Rigorous seepage and slope stability analyses • Off-site material required for construction • Environmental and socioeconomic constraints • Dense natural maritime hammock community • Healthy saltmarsh and freshwater wetland communities • Active planning coordination with FFWC, FWW, adjacent neighbors (Amelia Island Plantation and Fernandina Beach Municipal Airport)

  12. Project Overview

  13. NA-1 Unique Site Challenges • Geotechnical conditions • ICWW dredge material placed on the eastern side of the island between 1943 and 1960 • Western soils comprise medium to dense clean silty sand (3 – 9 feet below ground surface) underlain by 5 – 10 feet of very soft clayey sand 1943 Aerial Photograph • Environmental site conditions • Narrow band of freshwater wetlands located between the eastern and western portion of the island lobes • Centrally located eagle’s nest 1960 Aerial Photograph

  14. Summary of Settlement Analysis Results

  15. DMMA Cross Sections Western DMMA Cross Section Eastern DMMA Cross Section

  16. Summary • Long-Range Planning Efforts for Florida • DMMP for ICWW and OWW ongoing since 1986 and 1996 • Permitting and construction phases remaining • Florida Permitting Improvements • Advance coordination • Active communication • Government-driven streamlined process • Contact Information • Jim Marino (Jmarino@taylorengineering.com) • Lori Brownell (Lbrownell@taylorengineering.com) • John Adams (Jadams@taylorengineering.com)