1 / 21

FANS (Future Air Navigation System) Flight Crew Procedures

FANS (Future Air Navigation System) Flight Crew Procedures. Brad Cornell Flight Deck / Flight Crew Operations. 7 February 2012. Inmarsat Comm. Space. GPS - Navigation. Air. Ground. What is FANS? Future Air Navigation System. ATC FANS Protocol Defined Messages

Download Presentation

FANS (Future Air Navigation System) Flight Crew Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FANS (Future Air Navigation System)Flight Crew Procedures Brad Cornell Flight Deck / Flight Crew Operations 7 February 2012

  2. Inmarsat Comm Space GPS - Navigation Air Ground What is FANS?Future Air Navigation System

  3. ATC FANS Protocol Defined Messages CLIMB TO AND MAINTAIN [altitude] CROSS [position] AT [speed] 95% within 60s AOC Free text Multiblock Messages 1,000 characters 777, 787, A380 generates many multiblock messages No time requirements ATC versus AOC 20 55

  4. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Section 5 of the Global Data Link Document (GOLD) • Overview • Logon • Uplinks • Downlinks • Automatic Dependant Surveillance • Position Reporting

  5. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Overview • Data Link requires different flight procedures between the pilot flying and pilot not flying than are used for voice (very important) • Internal training program for FANS and integration with LOFT • Requires operational approval from state authorities • Operational approval enables regulators to ensure operators have an adequate training program and that the training program follows GOLD procedures. • When to use CPDLC and when to use voice communicaitons

  6. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Logon • Unlike ACARS to establish a CPDLC connection the flight crew must “Logon” to an ATC facility to establish a CPDLC connection • Procedures cover logging on when on the ground, after departure, and when entering a FANS capable FIR • Procedures also cover automatic “handoffs” between FIRs and handoff failures

  7. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Uplinks • Once a CPDLC connection has been established CPDLC messages can be exchanged between the aircraft and ATC • Each ATC data link (CPDLC) uplink message is annunciated to the flight crew using an aural and visual indication • Unlike voice communication CPDLC requires BOTH flight crew to read the uplink silently to maintain situational awareness • If reports are requested by ATC they should be responded to using CPDLC preformatted report messages not FREE TEXT • Crew training material should highlight and develop special procedures for use of Conditional Clearances Note:The Boeing 787 has a built in conditional clearance monitor function and the Boeing 777 has a crew reminder function that can be used to remind crew of conditional clearances

  8. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Uplinks - continued • Free Text has been and continues to be a problem with flight crews. Each operator’s training program should highlight and remind flight crew’s on the use of free text. • Preformatted messages should be used AT ALL TIMES in stead of typing out the same message using Free Text

  9. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Downlinks • Once a CPDLC connection is established the flight crew can create and send a “downlink” ATC message by using the pre-formatted message pages. • Preformatted messages should be used AT ALL TIMES in stead of typing out the same message using Free Text • To avoid potential ambiguity, the flight crew should avoid sending multiple clearance requests in a single downlink message

  10. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Uplinks • Once a CPDLC connection has been established CPDLC messages can be exchanged between the aircraft and ATC • Each ATC data link (CPDLC) uplink message is annunciated to the flight crew using an aural and visual indication • Unlike voice communication CPDLC requires BOTH flight crew to read the uplink silently to maintain situational awareness • Crew training material should highlight and develop special procedures for use of Conditional Clearances Note:The Boeing 787 has a built in conditional clearance monitor function and the Boeing 777 has a crew reminder function that can be used to remind crew of conditional clearances

  11. Chapter 5. Flight crew procedures..................................................................................................5-1 5.1 Overview................................................................................................................................5-1 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 5.1.4 Loss of SATCOM data communications....................................................................5-2 5.2 Logon......................................................................................................................................5-3 5.2.1 General........................................................................................................................5-3 5.2.2 When to initiate an AFN logon...................................................................................5-6 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 5.3 CPDLC – ATS uplinks............................................................................................................5-8 5.3.1 General........................................................................................................................5-8 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 5.3.3 Conditional clearances..............................................................................................5-10 5.3.4 “EXPECT” uplinks...................................................................................................5-11 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 5.4.1 General......................................................................................................................5-12 5.4.2 Free text....................................................................................................................5-13 5.4.3 Unsupported messages.............................................................................................5-14 5.4.4 CPDLC reports.........................................................................................................5-14 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 5.5.1 General......................................................................................................................5-14 5.6 Position reporting..................................................................................................................5-15 5.6.1 General......................................................................................................................5-15 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) Global Operational Data Link Document (GOLD) First Edition — 14 June 2010 5.6.4 Position reporting using FMC WPR.........................................................................5-17 5.7 Weather deviations and offsets..............................................................................................5-17 5.7.1 General......................................................................................................................5-17 5.7.2 Weather deviation requests and offsets....................................................................5-18 5.7.3 Deviations either side of route..................................................................................5-20 5.7.4 Reporting back on route...........................................................................................5-21 5.8 Emergency and non-routine procedures................................................................................5-21 5.8.1 Emergency procedures - general..............................................................................5-21 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 5.8.3 Voice communications.............................................................................................5-22 5.8.4 Data link system failures..........................................................................................5-23 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 • Chapter 5. Flight crew procedures..................................................................................................5-1 • 5.1 Overview...............................................................................................................................5-1 • 5.1.1 Operational differences between voice communications and CPDLC.......................5-1 • 5.1.2 Operational authorization to use CPDLC and ADS-C...............................................5-2 • 5.1.3 When to use voice and when to use CPDLC..............................................................5-2 • 5.1.4 Loss of SATCOM data communications....................................................................5-2 • 5.2 Logon.....................................................................................................................................5-3 • 5.2.1 General........................................................................................................................5-3 • 5.2.2 When to initiate an AFN logon...................................................................................5-6 • 5.2.3 Automatic transfer of CPDLC and ADS-C services between FIRs...........................5-6 • 5.2.4 Transfer voice communications with the CPDLC connection transfer......................5-7 • 5.2.5 Exiting CPDLC and ADS-C service areas.................................................................5-8 • 5.3 CPDLC – ATS uplinks............................................................................................................5-8 • 5.3.1 General........................................................................................................................5-8 • 5.3.2 Flight crew response times for uplinked messages.....................................................5-9 • 5.3.3 Conditional clearances..............................................................................................5-10 • 5.3.4 “EXPECT” uplinks...................................................................................................5-11 • 5.3.5 Uplinks containing FMS-loadable data....................................................................5-12 • 5.4 CPDLC – ATS downlinks.....................................................................................................5-12 • 5.4.1 General......................................................................................................................5-12 • 5.4.2 Free text....................................................................................................................5-13 • 5.4.3 Unsupported messages.............................................................................................5-14 • 5.4.4 CPDLC reports.........................................................................................................5-14 • 5.5 Automatic dependant surveillance – contract (ADS-C)........................................................5-14 • 5.5.1 General......................................................................................................................5-14 • 5.6 Position reporting..................................................................................................................5-15 • 5.6.1 General......................................................................................................................5-15 • 5.6.2 Position reporting in a non-ADS-C environment.....................................................5-16 • 5.6.3 Position reporting in an ADS-C environment..........................................................5-16 (vi) • Global Operational Data Link Document (GOLD) • First Edition — 14 June 2010 • 5.6.4 Position reporting using FMC WPR.........................................................................5-17 • 5.7 Weather deviations and offsets..............................................................................................5-17 • 5.7.1 General......................................................................................................................5-17 • 5.7.2 Weather deviation requests and offsets....................................................................5-18 • 5.7.3 Deviations either side of route..................................................................................5-20 • 5.7.4 Reporting back on route...........................................................................................5-21 • 5.8 Emergency and non-routine procedures................................................................................5-21 • 5.8.1 Emergency procedures - general..............................................................................5-21 • 5.8.2 CPDLC and ADS-C emergency...............................................................................5-21 • 5.8.3 Voice communications.............................................................................................5-22 • 5.8.4 Data link system failures..........................................................................................5-23 • 5.8.5 Using CPDLC to relay messages..............................................................................5-23 FANS Flight Crew Procedures • Logon • Unlike ACARS to establish a CPDLC connection the flight crew must “Logon” to an ATC facility to establish a CPDLC connection • Procedures cover logging on when on the ground, after departure, and when entering a FANS capable FIR • Procedures also cover automatic “handoffs” between FIRs and handoff failures

  12. 747-400 FANS Interface 737NG, 757, and 767 are Similar Forward CDU Functions • FMC • Company datalink (ACARS) • ATC datalink • SATCOM • CMC • AOC AFT CDU Functions • ACMS • Company datalink (ACARS) • CMC • SATCOM

  13. 747-400 ImplementationATC Data Link • Uplink Annunciation • Loadable Clearances • Armed Reports • Position Reporting • ATC Message Log

  14. ATC Data Link • Airplane Requests Clearance • Review • Send to ATC

  15. AOC Data Link • Accessible via MCDU key • Route Uplinks • Wind Uplinks • Position Reports • Route Data Reports

  16. 777 FANS Interface • Centralized alerting • Accept / Reject / Cancel Switches • Automatic ATC uplink display • Large format displays • Common interface for both • Company and ATC • Common user interface with • other function - ECL • Crew Reminder Function can • be used for conditional clearances

  17. 787 FANS Interface • Centralized alerting • Accept / Reject / Cancel Switches • Automatic ATC uplink display • Large format displays • Common interface for both • Company and ATC (FANS and ATN) • Common user interface with • other function - ECL • Conditional Clearance monitor

  18. 777 FANS 1 Implementation • MFD display • Cursor Control Selection • Functionally similar to 747-400

  19. 777 FANS 1 Implementation • Full Display of uplink • Color coded display • Action selection via CCD

  20. 777 FANS 1 Implementation • Route Request via MFD Form • Most pilot selections via form

  21. Questions?

More Related