1 / 4

Entity MIB WG

Entity MIB WG. Margaret Wasserman IETF 56 San Francisco March 2993. Agenda. Intro and Agenda Bashing -- Margaret (5 min) Document & Milestones Status -- Margaret (20 min) Entity State MIB -- Sharon Chisholm (20 min) Wrap-up and Action Items -- Margaret (5 min). Milestones.

adiego
Download Presentation

Entity MIB WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Entity MIB WG Margaret Wasserman IETF 56 San Francisco March 2993

  2. Agenda • Intro and Agenda Bashing -- Margaret (5 min) • Document & Milestones Status -- Margaret (20 min) • Entity State MIB -- Sharon Chisholm (20 min) • Wrap-up and Action Items -- Margaret (5 min)

  3. Milestones • JAN 03 Publish state/status extensions as a WG I-D • MAR 03 Evaluate status of the Sensor Entity MIB and collect implementation and interoperability reports • MAR 03 Submit state/status extensions to the IESG for Proposed Standard • MAR 03 Evaluate status of the Entity MIB and collect implementation and interoperability reports • MAR 03 Evaluate status of the Sensor Entity MIB and collect implementation and interoperability reports

  4. Entity MIB Status • Two implementations available for everything EXCEPT the logiccal to physical mapping table (entLPMappingTable) • Choices: • Deprecate the mapping table and proceed to DS • Wait

More Related