Sustainability and Thailand's Solar Home System: Is it still achievable? Observations from Tak province by

Sustainability and Thailand's Solar Home System: Is it still achievable? Observations from Tak province by. Renewable Energy Conference, BITEC Fredrik B jarneg å rd 6 July 2006.

adila
Download Presentation

Sustainability and Thailand's Solar Home System: Is it still achievable? Observations from Tak province by

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sustainability and Thailand's Solar Home System: Is it still achievable? Observations from Tak province by Renewable Energy Conference, BITEC Fredrik Bjarnegård 6 July 2006

  2. “The Service & Support Department is like the guy in the parade who walks behind the elephant with a broom and a big bucket”

  3. Thai Solar Home System (SHS) in context • 290,716 households without grid connection before SHS • 188,995 SHS in all Thailand • 15,000 SHS in Tak Province • Thai installed PV in 2003: 6 MWp • SHS program adds 23 MWp! • Responsibility of SHS will be transferred from the Provincial Electricity Authority (PEA) to Tambon (county) governments Tak Source: PEA, May 2006

  4. Thai SHS in Tak province Rated 150 W, 50 Hz, 230 V Inverter / 10 A Charge controller Rated 120 peak Watt single crystalline PV module AC outlet for TV or other appliances Two 10 W tube fluorescent lights with electronic ballasts 12 V, 125 Ah deep cycle lead-acid battery

  5. SHS Warranty • Warranty periods • Complete system: 2 years • Solar panel: 5 years • Charge controller/Inverter: 3 years • Battery: 2 years • Light/Ballast: 2 years • The system warranty is expiring within a few months • Very few villagers informed that there is a warranty • Huge need to inform villagers about warranty

  6. SHS Warranty • Postcards with warranty and maintenance information could be distributed by Tambons • Idea presented at meeting with DLA (Department of Local Administration)

  7. Installation company SHS user Tambon PEA Repair/replace equipment in response to warranty claim How to claim the SHS warranty • Villagers need to inform Tambon (local administration) government of broken systems • Tambon needs to send claims to PEA provincial office • PEA forwards warranty claims to installation company • Installation companies must repair within 1 week. • Otherwise they will be fined 200 baht per system per day

  8. Costs for replacing SHS • Equipment replacement cost: 130 to 300 baht/month • Villagers cannot afford new equipment when it fails Accumulated costs for replacing Thai SHS

  9. BGET SHS trainings in Tak province • Technician trainings in two districts • 3-day theory & hands-on training • cooperation with Tambons • The technicians • are provided with a tool box • get a SHS manual • http://www.palangthai.org/docs/TechManualThai.pdf • survey all SHS in their village cluster • make minor repairs and system improvements • educate homeowners in system use & maintenance • send surveys to BGET via the Tambon office • could help with repairs after the warranty expires

  10. BGET SHS trainings in Tak province Districts in Tak province • Mueang Tak • Ban Tak • Sam Ngao • Mae Ramat • Tha Song Yang • Mae Sot • Phop Phra • Umphang • Wang Chao Priority 1: 8,692 SHS Priority 2: 3,834 SHS

  11. BGET SHS trainings in Tak province Trainings already performed in ten Tambons

  12. BGET SHS trainings in Tak province

  13. Problems found during training surveys User error: bypassed controller  battery overcharge • Villager bypasses broken controller and charges battery directly from PV • Battery over-charged. Electrolyte level drops and plates are exposed to air. Battery fails. 1 2

  14. Problems found during training surveys User error: Controller bypass leads to burned diode 1 • Villager bypasses broken controller and charges battery directly from PV • One mistake of reverse battery polarity blows up bypass diode in PV junction box, melting junction box. 2

  15. Problems found during training surveys User error: Villager used inefficient60 W light bulb

  16. Problems solved during training surveys New inverter replacement: Solartron and PEA provided 15 inverters for the first 2 trainings

  17. Problems found during training surveys Manufacturing defect: Missing connector (Junction Box) Missing Correct Consequence: module never worked

  18. Problems found during training surveys Manufacturing defect: Diode with wrong polarity Correct polarity Incorrect polarity Consequence: module never worked

  19. Problems found during training surveys Installation error: Burned Diodes from Panel Reversed Polarity Consequence: System broken since the first day of installation

  20. Problems found during training surveys Installation error: Battery failure caused by solar panel installation in shady location 14:00 Saw Kre Ka village, Tha Song Yang District

  21. Problems found during training surveys Installation error: Bad panel locations

  22. SHS status survey • Survey based on sample of 405 systems from Tak • All systems in Tak province installed by Solartron. • Failure rates from other provinces or companies. • Anecdotal experiences from Chiang Mai and Krabi provinces show considerable failures as well.

  23. Sustainability of Thai SHS still achievable?

  24. Contact BGET Salinee Tavaranan, BGET Project Director Tel: 055-542-068 Mobile: 01-376-2027 www.bget.org