1 / 13

D-PHASE Operations Period (DOP): 1 June – 30 November 2007 d-phase

MAP D-PHASE: D emonstration of P robabilistic H ydrological and A tmospheric S imulation of flood E vents in the Alpine region http://www.map.meteoswiss.ch/d-phase. D-PHASE Operations Period (DOP): 1 June – 30 November 2007 www.d-phase.info.

adler
Download Presentation

D-PHASE Operations Period (DOP): 1 June – 30 November 2007 d-phase

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAP D-PHASE:Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the Alpine regionhttp://www.map.meteoswiss.ch/d-phase D-PHASE Operations Period (DOP): 1 June – 30 November 2007 www.d-phase.info

  2. Distributed real-time end-to-end forecasting system

  3. End-to-end forecasting system

  4. Atmospheric models: ensembles • COSMO-LEPS (COSMO) • 10 km; +132h; COSMO-LEPS EFI (MeteoSwiss) • MOGREPS (Met Office, United Kingdom) • 25 km; +54h • SREPS (INM, Spain) • 25 km, +72h • PEPS (SRNWP) • 7 km, +42h • COSMO-SREPS (COSMO) • 10 km, +72h • micro-PEPS (DWD for D-PHASE) • 2 km; +18h • LAMEPS-AT (ZAMG) • 20 km; fc+72h

  5. End-to-end forecasting system

  6. Atmospheric models: high resolution • MM5 (University of Hohenheim) • 2 km; +24h • COSMO-models (COSMO) • 2.2 km; +18h • 2.8 km; +30h, +48h, +21h • AROME (Météo-France) • 4 km (output grid); +30h • MOLOCH (ISAC-CNR, Italy) • 2.2 km; +39h • GEM-LAM (EC, Canada) • 2.5 km; +24h • MOLOCH, MM5, and WRF outside of COPS domain • ALADIN and QBOLAM at coarser resolution

  7. End-to-end forecasting system

  8. Hydrological catchments

  9. Some numbers about D-PHASE

  10. Organisation • Steering Committee • Dorninger, Staudinger (A), Rotach, Schär (CH), Volkert, Wulfmeyer (D), Bouttier, Richard (F), Buzzi, Frustaci, Ranzi, Rossa (I), Mylne (UK) • Working Groups • WG-DI: Data interface chair: Andrea Montani, ARPA-SIM (I) • WG-HEU: Hydrology and end users co-chairs: Roberto Ranzi, U Brescia (I), Christoph Hegg, WSL (CH) • WG-VER: Verificationchair: Manfred Dorninger, U Vienna (A) • WG-DP: Data policychair Mathias Rotach, MeteoSwiss (CH) • Project Coordinator: marco.arpagaus [at] meteoswiss.ch • http://www.map.meteoswiss.ch/d-phase

  11. Common (centralised) platforms Visualisation Platform (VP): • to visualise (display)all products and all alerts;main source of information for forecasters and end users (used also for COPS mission planning team); • interface for (some of) the users to submit their feedback on the available products and alerts, respectively, • realised by Next Generation Software (Salzburg). • www.d-phase.info

  12. Common (centralised) platforms Data Archive (DA) • to archive all data, alerts, and feedbacks;mainlyfor verification purposes • also stores all COPS and GOP data • physically based at the MPI in Hamburg • model data in GRIB1 format (GRIB1-details); • obs in netCDF format

  13. Timetable D-PHASE Operations Period (DOP):  1 June – 30 November 2007 Next Scientific Meeting: • 19 – 22 May 2008 in Bologna (Italy) for info, www.smr.arpa.emr.it/dphase-cost

More Related