320 likes | 552 Views
Gdańsk Container Terminal Co. Established in 1998. Our motto. GTK is…. Major advantages:. customer’s approach, professional and comprehensive services including terminal, depot and repair services. high quality standards . good connections to hinterland
E N D
Gdańsk Container Terminal Co Established in 1998
Our motto GTK is…
Major advantages: • customer’s approach, • professional and comprehensive services including terminal, depot and repair services. • high quality standards. • good connections to hinterland • excellent transit connection to Russia, Belarus, Ukraine, Slovakia and Czech Republic
Location: Port of Gdańsk
Technical facilities: • quay length 367 m • ship length up to 205 m • max. draft 9.8 m • open stores 67 417 m2 • reefer plugs – 95 units • ships operated in lo-lo systems • full support for railway wagons.
Technical facilities: • Ship-to-shore gantry crane- 40 / 60 t • Shore cranes- 40 t • Gantry cranes- 32 / 40 t • Straddle carrier- 40 t • Reach-stackers- 10 t • Mobile harbor crane- 100 t • 95 stations for refrigerated containers
Range of services: • loading / unloading, • all kind of container handling services, • stuffing, stripping, sampling, tallying, shifting ect. • depot services (storage, repairs, washing, cleaning), • goods storage on the yard, • goods storage in the warehouse, • consulting services • assistance in contacts with administration Autorities and institutions (Custom Office, Sanitary Office, Veterinary Border Inspection)
Specjalizacja: Nietypowe formowanie i rozformowywanie kontenerów Ładunki sypkie Sztuki ciężkie Drobnica
GTK Co. Strengths: • strong bussines relations with our customers, • experienced personnel with deep knowledge of the market and the core of business, • wide range of services (container terminal, containers’ repairs, container depot, containers’ stuffing & stripping services), • friendly IT software - SOTeK, • possibility of an automatic access and transfer the system data based on EDIFACT standard, • good location with increasing potential with road access to the terminal premises after completion the tunnel building under port cannal.
Railway Companies providing services to GTK Co.: • PKP Cargo • Spedcont • Prokont • Polzug • Cargosped • PCC Intermodal
CONTAINER FEEDER SERVICES HAMBURG BREMERHAVEN ROTTERDAM UNIFEEDER (calling twice a week ): Gdynia- Gdańsk (GTK)- Rotterdam Gdynia- Gdańsk (GTK)- Szczecin - Bremerhaven- Hamburg CMA - CGM (calling once a week ): Hamburg- Gdańsk (GTK)- Kaliningrad- Tallin- Hamburg Tallin Kaliningrad PORT OF GDAŃSK Szczecin
Major shipping lines handled at GTK: Hanjin Evergreen Hapag Lloyd APL CMA-CGM Cosco UASC MOL Hamburg SÜd ZIM CSAV China Shipping Yang Ming EUCON NYK Line K-Line NORASIA ANL Hyundai OOCL DELTA DELMAS Delphis
Business Activity: • Ship handling: 24 hours a day, 7 days a week, • Handling of the container inland transport: from 7.00 a.m. on Monday until 3.00 p.m. on Saturday.
Contact: Gdańsk Container Terminal Co. Headquarter: Na Zaspę 3, 80-546 Gdańsk, Poland Port Office:– ul. M. Chodackiego; Szczecińskie Quay NIP: 583-25-55-159 KRS: 0000108214; Register Court in Gdańsk Initial capital: PLN 500.140,00 Tel.: +(48) 58 737 7269 +(48) 58 737 72 71 +(48) 58 737 7274 +(48) 58 737 70 60Fax: +(48) 58 737 72 75E-mail: gtk@portgdansk.pl www.gtk-sa.pl Office working hours: 8.00 a.m. to 4.00 p.m. from Monday to Friday