1 / 8

REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’

Systems Division Mini-conference, 2 Oct 2013. REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’. Samuel Bemment Loughborough University Dr. Roger Dixon. UKACC PhD Presentation Showcase. Introduction.

adonia
Download Presentation

REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systems Division Mini-conference, 2 Oct 2013 REPOINT Phase 2:a.k.a ‘If you think you’re so smart, go ahead and build one…’ Samuel Bemment Loughborough University Dr. Roger Dixon UKACC PhD Presentation Showcase

  2. Introduction • Railway track switch designs have remained similar since Victorian times • REPOINT (2011-2013) explored benefits of re-engineering • Step change in capacity • Junction control rule changes • One design very promising • 3 patents • REPOINT 2 (2013-2014) to build lab-scale demonstrator

  3. Systems Division Mini-conference, 19 Sept 2013

  4. Systems Division Mini-conference, 19 Sept 2013

  5. Phase 2 Project Plan • 15 Months from June 2013, • £356k funding from ‘Enabling Innovation Team’ • Concept Refinement, Subsystem Design and Validation, Outline Design Deliverable: • Concept Demonstration in Lab and Outline Designs

  6. Building a REPOINT HiTL Demonstrator • Start small…

  7. Building a REPOINT HiTL Demonstrator • Aim Bigger…

  8. Summary • Capacity of rail networks depends upon switches • Switch technology is the limiting factor • We are prototyping a novel switch design • The design is simple, but it will need control engineering to function • There are many other knock-on benefits (too many for 4 minutes) …Thanks for listening! £ Billions

More Related