Introduction • Railway track switch designs have remained similar since Victorian times • REPOINT (2011-2013) explored benefits of re-engineering • Step change in capacity • Junction control rule changes • One design very promising • 3 patents • REPOINT 2 (2013-2014) to build lab-scale demonstrator
Phase 2 Project Plan • 15 Months from June 2013, • £356k funding from ‘Enabling Innovation Team’ • Concept Refinement, Subsystem Design and Validation, Outline Design Deliverable: • Concept Demonstration in Lab and Outline Designs
Building a REPOINT HiTL Demonstrator • Start small…
Building a REPOINT HiTL Demonstrator • Aim Bigger…
Summary • Capacity of rail networks depends upon switches • Switch technology is the limiting factor • We are prototyping a novel switch design • The design is simple, but it will need control engineering to function • There are many other knock-on benefits (too many for 4 minutes) …Thanks for listening! £ Billions