Status, open issues

Status, open issues. Ilija Vukotic. Content. Status Remaining site availability issues Testing, testing and more testing To do list. Stability. S tress testing. Much more stable after move to Rucio Most brief “reds” caused by my stress testing. S tress testing. Deployment.

adonia
Download Presentation

Status, open issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status, open issues Ilija Vukotic

  2. Content • Status • Remaining site availability issues • Testing, testing and more testing • To do list

  3. Stability Stress testing • Much more stable after move to Rucio • Most brief “reds” caused by my stress testing Stress testing

  4. Deployment • Upgrades are coming LFC-free c++ n2n exists and was tested long enough. RPM will be produced this week. We recommend it deployed at all the sites.

  5. Operations • A sitename collection enabled. Now to get it used by the Dashboard. • One FR site came back (IN2P3-LAPP). Need more effort there • In process of adding Beijing endpoint • The only remaining issue is opening the port.

  6. localSetupFAX • In version 11. Sets xrootd client 3.3.6. • freeGeoIP service now hosted at MWT2 using freeGeoIP.net as a fallback • SSB was unavailable in at least two periods during last week. FAX-get-best-redirector depends on it to find out status of endpoints. • New command: FAX-get • Equivalent to dq2-get • Feature list (wishes): • N parallel transfers • Choosing the best source (based on cost matrix) • Multiple site sources (maybe even extreme copy)

  7. Plans • Push on deployment • Continue USA cloud stress testing • Further tutorial development