1 / 6

Reliability

Reliability. Different factors contribute to reliability: 1. Design 2. Reliability analysis 3. Production + production test. Neways. Neways. International company: - 13 branches located in 5 countries Apart from production portfolio also includes: - Engineering

adonis
Download Presentation

Reliability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reliability • Different factors contribute to reliability: 1. Design 2. Reliability analysis 3. Production + production test Neways

  2. Neways • International company: - 13 branches located in 5 countries • Apart from production portfolio also includes: - Engineering - Aftersales (service + repair) - Testing (+development of test equipment) • Octopus production: Leeuwarden

  3. Neways Leeuwarden • New site (< 5 years old) • New production facility with high end equipment • Certified for military grade production  supplier for Dutch army

  4. Production tracking • Every component reel is tagged with barcode • Tagging is performed directly after arrival • Use of barcode scanners  tracking • Tracking system guarantees that right component is placed at right position • PCB also receives barcode  tracking of assembled product • Tracking system controls complete production flow • Chance of mix-ups by human errors is small

  5. Database • Tracking system gives input to database • Database holds production relevant information: - Registered anomalies during production (e.g. failed inspection on a board) - Output from test machine - Production details (e.g. timestamps, personnel involved, ...) - Etc. • Database is stored without time constraint

  6. Quality checks • All units are subjected to: - 3D solder paste inspection - Automated Optical Inspection (AOI) - Manual inspection - KVI-CART test machine • Test results of KVI-CART test machine are linked to tracking system • (Xray machine  not all suppliers have this)

More Related