About us<br><br>Advance Engineering and Testing is one of the leading electrical service providers in Singapore. <br><br>Switchgear Troubleshooting:<br><br>u25cfIdentify and isolate the faulty component or circuit.<br>u25cfCheck for loose connections and tighten them if necessary.<br>u25cfUse diagnostic tools like infrared cameras for thermal imaging.<br>u25cfInspect insulation and perform insulation resistance tests.<br><br>Primary Injection Testing:<br><br>u25cfVerify the correct operation of circuit breakers or protective devices.<br>u25cfInject a current directly into the primary side of the equipment.<br>u25cfEnsure that the tripping characteristics match the

aetsg01
Download Presentation

Effective operations of breaker contact resistance measurement by AET

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Effective Operations of Breaker Contact Resistance Measurement by AET

  2. About Us Advance Engineering and Testing is one of the leading electrical service providers in Singapore.

  3. Switchgear Troubleshooting ●Identify and isolate the faulty component or circuit. ●Check for loose connections and tighten them if necessary. ●Use diagnostic tools like infrared cameras for thermal imaging. ●Inspect insulation and perform insulation resistance tests.

  4. Primary Injection Testing: ●Verify the correct operation of circuit breakers or protective devices. ●Inject a current directly into the primary side of the equipment. ●Ensure that the tripping characteristics match the specifications. ●Identify and rectify any issues with the protection system.

  5. Earth Loop Impedance Test: ●Measure the impedance of the earth loop in an electrical circuit. ●Ensure proper grounding and bonding of electrical installations. ●Use a loop impedance tester to assess the effectiveness of the earth connection. ●Identify and resolve any issues that may compromise safety.

  6. Pilot Wire Commissioning: ●Verify proper installation and connection of pilot wires. ●Check communication between different devices connected by pilot wires. ●Ensure correct settings and configurations for pilot protection schemes. ●Conduct functional tests to validate the reliability of the pilot wire system.

  7. CT Tangent Delta Testing: ●Measure the capacitance and dissipation factor of current transformers (CTs). ●Assess insulation quality and detect potential faults in CTs. ●Use a tangent delta test set to determine the tangent of the phase angle. ●Evaluate the condition of CT insulation and identify any degradation.

  8. Contact Us: For additional information: For additional information: Phone: +65 97227574, +65 62327968 Email: contact@aetsg.com.sg Website: https://aetsg.com.sg/