An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGENDA – PUBLIC FORUMOctober 12, 2009 • Welcome and Background – Rod Lehnertz • Site Evaluation Progress Report – Joe Hibbard • Public Discussion • Closing

  2. Site Evaluation Studies for Hancher Voxman ClappReplacement FacilitiesUniversity of IowaOctober 12, 2009

  3. Alternative Sites for HVC Replacement FacilitiesMarch 6,2009

  4. Site Selection Criteria LAND Ownership status Site size Site shape Expansion potential Utilities availability Topography, flood exposure Proximity to related programs Existing use and possible displacements Competition for future University uses CIRCULATION 10. Vehicular access and traffic impacts 11. Parking availability; event and daily use 12. Service access 13. CAMBUS access 14. Pedestrian access SENSORY ENVIRONMENT 15. Appropriateness of architectural scale and massing 16. Views and visual impacts 17. Open space impacts 18. Image and character 19. Symbolic associations – historical and cultural values 20. Potential for creation of quality outdoor spaces 21. Solar exposure, shadow and microclimate impacts

  5. Viable Site Options Park Road West site Clinton Street Burlington Street East site

  6. Factors Identified for Additional Study, after the First Phase of the Site Selection Process : • Site Organization and Site Development Costs • Possible Variations in Building Mechanical System Costs • Utility Services • Traffic Impacts • Daily Parking, Event Parking and School Bus Parking • Service Access to Buildings • Sound Isolation • Flood Exposure • Campus Land Use

  7. Site Selection Assumptions • The HVC building program requirement for site testing purposes will be 418,881 gsf, and parking demand will be 1400 spaces • Ideally, Hancher, Voxman and Clapp should be located together as a single complex on a single site, however a split program option should be explored to determine if site location advantages can be achieved. • The School of Music should be within reasonable walking distance of the undergraduate classroom core of the campus

  8. Site Selection Assumptions • The HVC building program requirement for site testing purposes will be 418,881 gsf, and parking demand will be 1400 spaces • Ideally, Hancher, Voxman and Clapp should be located together as a single complex on a single site, however a split program option should be explored to determine if site location advantages can be achieved. • The School of Music should be within reasonable walking distance of the undergraduate classroom core of the campus

  9. HVC Building Program Requirements Used in the Site Evaluation Process – ( Total Program 418,881 gsf) Hancher Component: 159,971gsf 38% Hancher Auditorium – 2100 Seat Hall and associated flexible rehearsal space Principally a public oriented performance facility Does not necessarily require a site within the undergraduate core area School of Music Component: 258,910 gsf 62% Academic space plus four performance Halls totaling 1600 seats Principally an academic teaching and performance facility Favors a location close to the undergraduate core area

  10. HVC Parking Program Requirements Used in the Site Evaluation Process • Existing parking serving HVC and Theatre Building 1018 spaces • Proposed West Site Parking = 1211 to 1400 spaces • Proposed East Site Parking = 982 to 1156 spaces • Proposed Split Option Parking = West 901, East 500, total 1401

  11. Inundation Limits • Used in the Site • Evaluation Process • 55,000 CFS is a working estimate of the 500 year flow. A final determination will be made in the the 2009 Corps of Engineers Iowa River Basin Hydrologic Study. • University Flood Mitigation Task Force Guidelines: • No buildings shall be located in the 500 year flood plain • All building space below 500 year plus 2 feet elevation must be easily evacuated and recovered. • (2008 Flood was 42,000 CFS) 55,000 CFS INUNDATION

  12. Option 1 Park Road HVC West site Clinton Street Burlington Street

  13. Option 2 Park Road Clinton Street Burlington Street HVC East site

  14. Option 3 Park Road H West site Clinton Street Burlington Street VC East site

  15. Factors that tend to be neutral in decision making: • Adequacy of Land Area • Flood Protection • Traffic Operations • School Bus Logistics • Parking Capacity • Availability of CAMBUS Service • Provision of adequate Service Access for Buildings • Sound Isolation • Site Organization Factors • Building Costs Differentiating Factors: • Parking Operations and Parking Construction Costs • Utility Construction Costs • Site Development Construction Costs • Land Acquisition Costs • Program Displacement Costs • Campus Land Use

  16. West Site

  17. West Site Existing Conditions Map

  18. Option 1A, Full Program at West Site with Surface Parking

  19. Option 1B, Full Program at West Site with Deck Parking

  20. Option 1C, Full Program at West Site with Parking Ramp

  21. Option 1A, 1B, 1C: Full Program at West Site ADVANTAGES Site is owned by University No program displacements Prominent visibility of Hancher from Dubuque St. and Park Rd. Continues the historic association of HVC with the attractive landscape of the Iowa River corridor Clear wayfinding from 1-80 for Hancher Land available for possible geothermal well fields ISSUES Distance of the School of Music from the undergraduate classroom core and student services Higher utility costs and site development costs than Option 2 Will require building new surface or ramp parking spaces. Higher construction costs for parking than Option 2 Parking will be somewhat more distant from the Hancher front door because of site constraints Functional and visual impacts on Levitt Center Impacts on river park green space if a ramp is not built

  22. East Site

  23. East Site Existing Conditions Map

  24. Option 2, Full Program at East Site

  25. Option 2, Full Program at East Site ADVANTAGES Close to undergraduate classroom core, student services and support functions in downtown Creates a continuity of the campus extending south directly from Old Capitol Facilitates a pedestrian oriented campus Served by City transit and CAMBUS Tangible contribution to vibrancy of the east campus and downtown Least cost option for parking, utilities and site costs ISSUES Requires acquisition of land, highest land cost Displacement of the Engineering Research Building Will require more active management of parking for large events Perceived concerns with wayfinding from 1-80 for Hancher Potential concerns with ramp exiting after events, compared to Option 1

  26. Option 3, Split Program, Hancher West and Voxman - Clapp East

  27. Option 3, Split Program, Hancher West and Voxman - Clapp East

  28. Option 3 Split Program: Hancher West, Voxman Clapp East ADVANTAGES School of Music is close to undergraduate classroom core, student services and support functions in downtown Creates a continuity of the campus extending south directly from Old Capitol Facilitates a pedestrian oriented campus Contribution to vibrancy of the east campus and downtown Prominent visibility of Hancher from Dubuque St. and Park Rd Disperses traffic and parking demands Served by City transit and CAMBUS ISSUES Requires acquisition of land Will require more active management of parking for large events Costs for utilities and for site development than Option 2 Logistics for movement between Hancher and the School of Music is more difficult than other Options

  29. Option 1 Option 2 Option 3 Summary of Options

  30. Option 1 Option 2 Option 3 $3.2M $1.2M $3.2M $3.4M $3.2M UTILITIES

  31. Option 1 Option 2 Option 3 $7M $0 $12.5M $6.4M $19.2M PARKING

  32. Option 1 Option 2 Option 3 $7M $4.4M $9.4M $9.2M $9.1M SITE DEVELOPMENT

  33. Option 1 Option 2 Option 3 $0 $7.9M $0 $0 $0 PROGRAM DISPLACEMENT

  34. Option 1 Option 2 Option 3 $0 6 PARCELS $0 4 PARCELS $0 LAND ACQUISITION

  35. Web: http://facilities.uiowa.edu/hvc-site.htm E-mail: hvc-site@uiowa.edu

  36. end