1. Surveillance Working GroupStatus Report Rick Heinrich and Debby Kirkman
21 October 1999
2. Terms of Reference for Phase II Develop a Surveillance Roadmap by August 00 that:
Provides recommendations for surveillance applications and capabilities, automation improvements, and aircraft systems
Is driven by the surveillance operational concept
Identifies the overall timing for the introduction of new capabilities and technologies, as well as sunset timeframes for those that are superceded
Lists key decision points and the events and activities they are predicated upon
Assess factors in developing a consensus recommendation on issues supporting a U.S. ADS-B decision in 2001
Maintain and update the Surveillance Operational Concept
Elaborate on the future operation of the Operational Errors and Detection Program
Coordinate the operational concept with other stakeholders
Adjust content based on feasibility results of architecture roadmap activity
3. Surveillance Roadmap: Notional Elements Timelines
Identifies timing of new capabilities
Identifies the sunset timeframes for capabilities that are superceded
Intended to illustrate user priorities
Functional
Intended to illustrate evolving capabilities and dependencies
Will include the architectural perspective
Physical
Assess the current systems
Assess potential shortfalls of the current-to-future operational environment
Actions and Decisions
Key steps that must be completed along the way
Decision points that revalidate the proposed direction for surveillance