Working group report

Working group report. T500 and E203 Armin Reichold. Wish list for FACET for user run ( E203 ). Reliable and calibrated beam data (BPM TMIT’s vary among themselves and from toroids )

buffy
Download Presentation

Working group report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Working group report T500 and E203 Armin Reichold A Reichold, for SP group, FACET User Meeting, SLAC

  2. Wish list for FACET for user run (E203) • Reliable and calibrated beam data (BPM TMIT’s vary among themselves and from toroids) • Clear written instructions which instruments give reliable data, how to access them and what their calibration is or how it can be found • Layout of facet with actual survey positions of instrumentation and experimental apparatus • Toroid data should be available in EPICS and EPICS archive • Access to EPICS archive from outside SLAC (so far only via facet-srv01) • Users should not write their own beam data logging system. This should be central EPIC archive. Need help with this. Probably in form of software and hardware. • Access routines to EPICS archives from user code (not just from interactive tool such as FACET home) to be provided by SLAC A Reichold, for SP group, FACET User Meeting, SLAC

  3. Wish list for FACET for user run (E203) • EPICS tutorials and examples • Beam profiles in LI20 to be taken under user control and archived • If “SLAC” want to use E203 in our absence we need a new grating and filter control system with digital controls (all analogue & manual now). Do we need to mover our DAQ-control from matlab to EPICS. Need to collaborate on this. • Beams at E203 circular or elliptical with dy>dx and a method for measuring/extrapolating the beam cross-section at our location from wire scans • Alternative method for measuring grating approach to beam. Now we monitor backgrounds and “inch” forward until “it hurts”. Maybe could use pick-ups on gratings? Need advice and collaboration. • IR background reduction using coated beam pipes • Moving DAQ below the table (needs tray fixed to bottom of table, cable could not reach floor level) A Reichold, for SP group, FACET User Meeting, SLAC

  4. Joint list T500 – E203 • Both experiments will define common bunch length variable by using time in which 1-sigma and 90% charge is contained • T500 will use temporal reconstruction based on same phase reconstruction algorithm • DAQ and data storage • Initially aim to write both of our data into EPCIS or other common platform in offline mode but have no idea yet how to do this. • Need to be able to do Beam Synchronous Acquisition (BSA) • First step: time server to synchronise better than 10Hz • Real BSA • Clarify the relation between beam pulse ID in EPICS and SCP • Both experiments would like to have burst mode (single bunch) • Humidity, temperature and pressure measurements on T500 and E203 experiments • Preparation for dry air volumes around experiments to reduce absorption. Dry air supply, “tent or box” A Reichold, for SP group, FACET User Meeting, SLAC