THORPEX Africa Actions and Decisions from ICSC9. WMO, Geneva 8-10 May 2012 Jim Caughey, THORPEX IPO. ICSC9 Actions and Decisions THORPEX Africa.

africa
Download Presentation

THORPEX Africa Actions and Decisions from ICSC9

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THORPEX AfricaActions and Decisions from ICSC9 WMO, Geneva 8-10 May 2012 Jim Caughey, THORPEX IPO

  2. ICSC9 Actions and Decisions THORPEX Africa ICSC9(14): Develop a list of key African NHMS, other government, and university contacts with both the interest and capacity to participate in THORPEX African case studies, and R&D Action: African RC Timescale: December 2011 Progress: RC membership refreshed .......

  3. Contd. ICSC9(15) : Request for all THORPEX WGs to examine how they can further develop activities to assist the African RC (case studies/demonstration projects, training, capacity-building, data, etc.) Action: THORPEX WGs Timescale: On-going (make a focus at next respective WG meetings) Progress: All WGs are represented at this meeting. Consider at next WG meetings

  4. Contd. ICSC9(16): Utilize PDP web site to post information about African RC plan, case studies, and African contacts Action: African RC, PDP WG Timescale: Early 2012 Progress: PDP website nearing completion.

  5. Contd., ICSC9(17): Distribute past unsuccessful funding proposal(s) developed by African RC, THORPEX IPO, and others, to THORPEX and WWRP WGs Action: African RC, THORPEX IPO Timescale: ASAP Progress: Available at this meeting

  6. Contd., ICSC9(18): Develop/review/fund proposals to support networking opportunities for African researchers on request and on a case-by-case basis Action: African RC, THORPEX IPO Timescale: 2012 fiscal year Progress: No requests yet. ICSC9(19): Establish closer collaborations with on-going African SWFDPs and West Africa RMSC Action: African RC Timescale: 2012 Progress: SWFDPs invited to this meeting, Developing products for West Africa

  7. Resource Mobilisation(Alan Edwards EC) • The orientation paper for the Security Theme in preparation for their 2013 Work Programme shows a topic SEC-2013.2.1-2 Impact of extreme weather on critical infrastructure – Capability Project.  I’ve attached this paper for your information, so that you can see more detailed information on this possible topic.   • A similar “linked” topic in the outline of the 2013Work Programme for the FP7 Environment Them, ENV.2013.6.4-4 Towards stress tests for critical infrastructures against natural hazards.  I’m also attaching this document for your info.

  8. Resource Mobilisation • One other possibility that I mentioned to you is to look at what might be possible under the PEOPLE (Marie Curie fellowship/training programme) part of FP7.  You can find a general overview of this Programme at:http://cordis.europa.eu/fp7/people/home_en.html • and links to the currently open calls at https://ec.europa.eu/research/participants/portal/page/fp7_calls