Lifetime prediction of PVC push-fit joints André Marques Arsénio Vakantiecursus – 10 th January 2014 TU Delft. Four step approach for network management. 1) Select the “best” pipe for inspection. 2) Inspect the pipes 3) assess condition
E N D
Lifetime prediction of PVC push-fit jointsAndré Marques ArsénioVakantiecursus – 10th January 2014TU Delft
Four step approach for network management 1) Select the “best” pipe for inspection. 2) Inspect the pipes 3) assess condition 3a) If the condition of the asset is below a previously defined threshold, repair/replace; 3b) Predict the remaining lifetime, t, of the asset exploiting an appropriate model; and finally 4) Schedule a new inspection after a period, t‘<t.
Inspection-prioritization map Red = Highest priority Increasing inspection priority Green = Lowest priority
Condition assessmentProcedure • Measure gaps at four positions Ring
Condition assessmentClosed-circuit television CCTV equipment: Entry-point: Courtesy: MJ Oomen
Conclusion • Four step approach for network management • Resource optimization: indicates best pipes for inspection • Condition assessment procedure used with any inspection equipment • IJC is a powerful tool that allows comparing several pipes – which one is in worst condition?