DoD Instruction 5000.02 8 December 2008 O peration of the Defense Acquisition System Statutory and Regulatory Changes. Bradford Brown Director for Acquisition & Program management. DoDI 5000.02, December 2008. Topics:. DoDI 5000.2: 2003 vs. 2008 New Policy Directed by Congress
E N D
DoD Instruction 5000.028 December 2008Operation of the Defense Acquisition System Statutory and Regulatory Changes Bradford Brown Director for Acquisition & Program management
DoDI 5000.02, December 2008 Topics: • DoDI 5000.2: 2003 vs. 2008 • New Policy Directed by Congress • New or Revised Regulatory Policy • Statutory & Regulatory Information & Milestone Requirements • New/Revised Enclosures to DoDI 5000.02 • The Defense Acquisition Management System - Milestones, Phases and Key Activities
Changes to the May 2003 DoDI 5000.02 • Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements) • Approved Policy Appearing in over 25 Policy Memos and DoD Responses to the GAO, IG, and Congress • Reference to 10 Updated or Newly Issued DoD Publications • Consideration of Over 700 Defense Acquisition Policy Working Group (DAPWG) Comments
B A C B C A Comparison of 2003 vs. 2008 Defense Acquisition Management Framework- 2003 User Needs & Technology Opportunities Program Initiation FOC IOC Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support Design Readiness Review FRP Decision Review Concept Decision Focus of major changes Defense Acquisition Management System - 2008 User Needs Technology Opportunities & Resources ProgramInitiation IOC FOC MaterielSolutionAnalysis Technology Development Engineering and Manufacturing Development Production & Deployment Operations & Support Post PDR Assessment FRP Decision Review Materiel Development Decision Post-CDR Assessment PDR PDR 4 or
B CDD CPD MDD O&S FCB The Defense Acquisition Management System 2008 Technology Opportunities & Resources User Needs A C Operations & Support Production & Deployment Materiel Solution Analysis Engineering & Manuf Development ICD Strategic Guidance Joint Concepts Capabilities - Based Assessment Technology Development AOA Incremental Development COCOM OSD/JCS Acquisition Process JCIDS “Following the Materiel Development Decision (MDD), the MDA may authorize entry into the acquisition management system at any point consistent with phase-specific entrance criteria and statutory requirements.”
C A CDD CPD The Defense Acquisition Management System 2008 User Needs Technology Opportunities & Resources B IOC FOC Materiel Solution Analysis Technology Development Engineering and Manufacturing Development Production & Deployment Operations & Support ICD Materiel Development Decision FRP Decision Review Post PDR Assessment Post CDR Assessment AoA PDR PDR CDR or Pre-Systems Acquisition Systems Acquisition Sustainment Changes to Decision Points Old (2003) New (2008) Change from 2003 Concept Decision (CD) Materiel Development Decision (MDD) MDD required prior to entering the process at any point N/A Post-PDR Assessment MDA’s assessment of PM’s PDR Report (if PDR after MS B) Design Readiness Review DRR Post-CDR Assessment MDA’s assessment of PM’s CDR Report
C A CDD CPD The Defense Acquisition Management System 2008 User Needs Technology Opportunities & Resources B IOC FOC Materiel Solution Analysis Technology Development Engineering and Manufacturing Development Production & Deployment Operations & Support ICD Materiel Development Decision FRP Decision Review Post PDR Assessment Post CDR Assessment AoA PDR PDR CDR or Pre-Systems Acquisition Systems Acquisition Sustainment Changes to Phases Old (2003) New (2008) Change from 2003 More robust AoA (result of changes to JCIDS) Concept Refinement (CR) Materiel Solution Analysis Technology Development (TD) Competitive prototyping Systems Development & Demonstration (SDD) Engineering & Manufacturing Development (EMD) More robust system engineering
CDD CPD The Defense Acquisition Management System 2008 Preliminary Design Review B C Technology Development Engineering & Manufacturing Development Post CDR Assessment Post PDR Assessment PDR PDR CDR or PDR Before Milestone B PDR After Milestone B • Planned for in Technology Development Strategy • PDR Report provided to MDA at MS B • Includes recommended requirements trades • Planned for in Acquisition Strategy • PDR Report provided to MDA prior to Post PDR Assessment • Reflects requirements trades • At Post PDR Assessment, MDA considers PDR report; determines action(s) required to achieve APB objectives and issues ADM
CDD CPD The Defense Acquisition Management System 2008 Engineering & Manufacturing Development – Two Major Efforts B C Integrated System Design System Capability & Manufacturing Process Demonstration Post CDR Assessment Post PDR Assessment PDR PDR CDR or Old (2003) New (2008) Change from 2003 Establishment of Product Baseline for all Configuration Items System Design Integrated System Design System Demonstration System Capability & Manufacturing Process Demonstration Manufacturing processes effectively demonstrated; production-representative article(s) demonstrated in intended environment; T&E assesses improvements to mission capability and operational support based on user needs.
New Policy Directed by Congress • Military Equipment Valuation (accounting for military equipment) • MDA Certification at Milestones A & B • Cost type contract for EMD Phase requires written determination by MDA • Lead Systems Integrator Restrictions • Replaced System Sustainment Plan • Configuration Steering Boards (CSBs)
New Policy Directed by Congress Continued… • New MAIS Reporting Requirements • “Time-Certain” IT Business Systems Development • Defense Business Systems Oversight • MDA assessment of compliance with chemical, biological, radiological, and nuclear survivability (CBRN) requirements at Milestones B and C • Data Management Strategy
New Policy Directed by Congress Continued… • Detailed Acquisition of Services Policy • Independent management reviews (Peer Reviews) for supplies and services contracts • Interim Beyond LRIP Report • DOT&E’s Role in Testing Force Protection Equipment / Non-Lethal Weapons • Nunn-McCurdy breach / APB Revision Procedure • Cost of energy in AoA and resource estimate
New or Revised Regulatory Policy • Detailed Systems Engineering Policy • Program Support Reviews (PSRs) • Integrated Developmental and Operational Test & Evaluation • Restricted use of performance requirements that do not support KPPs • Comparison with current mission capabilities during OT&E • Assessment of Operational Test Readiness (AOTR) • Contract Incentives Strategy • Life-Cycle Sustainment Plan (LCSP)
New or Revised Regulatory Policy Continued… • Contracting for Operational Support Services • Approval of Technology Development Strategy prior to Release of final RFP for Technology Development Phase • Approval of Acquisition Strategy prior to release of final RFP for EMD or any succeeding phase. • Reliability, Availability, and Maintainability (RAM) strategy • Review and Assessment of New or Modified Communications Waveforms. • Evolutionary Acquisition Revised c
No spirals! Evolutionary Acquisition From two processes… To one process… • Capability delivered in increments, recognizing up front need for future capability improvements • Each increment: • depends on mature technology • is a militarily useful and supportable operational capability • Successive Technology Development Phases may be needed to mature technology for multiple increments • Incremental Development: End-state is known; requirements met over time in several increments • Spiral Development: End-state is not known; requirements for increments dependent upon technology maturation and user feedback.
Enclosures to DoDI 5000.02 1 References 2 Procedures 3 ACAT and MDA 4 Statutory and Regulatory Information and Milestone Requirements Table 5. EVM Implementation Policy Table 6. APB Policy Table 7. Unique Decision Forums 5 IT Considerations 6 Integrated T&E 7 Resource Estimation 8 Human Systems Integration 9 Acquisition of Services 10 Program Management 11 Management of Defense Business Systems 12 Systems Engineering } Tables Updated ▀New
Enclosure 4, Table 2-1 Statutory Requirements Added For MDAPs & MAIS When Required Requirement Reference Comment Analysis of Alternatives (AoA) 10 USC 2366a Title 40, Sec III MS A, B C Pgm Initiation for Ships Updated as necessary at MS B and C Data Management Strategy 10 USC 2320 MS A, B, C & FRPDR Part of TDS or Acq Strategy Military Equipment Program Valuation PL 101-576 & Statement of Federal Financial Accounting Standards, No 6. MS C & FRPDR (or Equiv) Part of Acq Strategy
Enclosure 4, Table 2-1 Statutory Requirements Added For MDAPs Only When Required Requirement Reference Comment MDA Program Certification 10 USC 2366 a & b MS A & B MS C (if program initiation) Requires cost est. at MS A Nunn-McCurdy Assessment & Certification 10 USC 2433 When Service Secretary reports an increase in cost that equals or exceeds the critical cost threshold increase of 25% over “current” PAUC or APUC APB values. Increase of 50% over “original” PAUC or APUC APB values Replaced System Sustainment Plan 10 USC 2437 MS B Program initiation for ships
Enclosure 4, Table 2-1 Statutory Requirements Added For MAIS Only When Required Requirement Reference Comment Assessment & certification of a critical change to the Defense Committees 10 USC 2445c NLT 60 days after receiving a MAIS Quarterly Report indicating a critical program change Failed to achieve IOC w/in 5 yrs after funds were first obligated; schedule change of 1 yr or more; incr in dev cost or life cycle cost of 25% or more; or a change in expected performance that undermines ability of sys to perform anticipated functions Notification of a significant change to the Defense Committees 10 USC 2445c NLT 45 days after receiving MAIS Quarterly Report indicating a significant change Schedule change of more than 6 mos, but less than 1 yr; incr in development cost or life cycle cost of at least 15%, but less than 25%; or significant adverse change in expected performance MS C if pgm initiation or equiv to Full Deply DR DoD CIO Confirmation of CCA Compliance Sec 811, PL 106-398 MS A, B, C, Full Deployment DR
Enclosure 4, Table 2-1 Statutory Requirements Added For MAIS Only, continued… When Required Requirement Reference Comment DBSMC Certification for Business Systems Modernization 10 USC 2222 Prior to obligation of funds See Encl. 11, DoDI 5000.02 Notice of MAIS Cancellation or significant reduction in Scope Sec 806, PL 109-163 60 Days prior to MDA decision to cancel or significantly reduce scope of fielded or post MS C MAIS Due 45 days after the President’s Budget is submitted to Congress MAIS Annual Report to Congress 10 USC 2445b Annually, after first occurrence of any of the following events: MDA designation, MS A, or MS BD MAIS Quarterly Report 10 USC 2445c Quarterly following initial submission of a MAIS Annual Report
Enclosure 4, Table 2-2 Statutory Requirements Added For ACAT II and Below Programs (unless otherwise noted) When Required Requirement Reference Comment Updated as necessary at MS B and C Analysis of Alternatives (AoA) – all IT including NSS 40 USC Subtitle III MS A, B & C Data Management Strategy (ACAT II only) 10 USC 2320 MS B, C & FRPDR Part of Acq Strategy LRIP Quantities (ACAT II only) 10 USC 2400 MS B Military Equipment Program Valuation PL 101-576 & Statement of Federal Financial Accounting Standards, No 6. MS C & FRPDR (or Equiv) Part of Acq Strategy
Enclosure 4, Table 3 Regulatory Requirements Added/Revised For All Programs (unless otherwise noted) When Required Requirement Reference Comment Acquisition Info Assurance Strategy DoDI 8580.1 All IT, Including NSS MS A, B, C & FRPDR or FDDR Analysis of Alternatives (AoA) DoDI 5000.02 Updated as necessary at MS B and C MS A, B, & C Full Deployment DR for AIS AoA Study Guidance DoDI 5000.02 MDD Component Cost Estimate DoDI 5000.02 MDAP: MS B & FRPDR MAIS: whenever EA is required Mandatory for MAIS; optional for MDAP Corrosion Prevention Control Plan DoDI 5000.02 MS B & C Part of Acq Strategy ACAT I only Life Cycle Sustainment Plan DoDI 5000.02 MS B, C & FRPDR Part of Acq Strategy Life Cycle Signature Support Plan DoDD 5250.01 MS A, B, & C
Enclosure 4, Table 3 Regulatory Requirements Added/Revised For All Programs (unless otherwise noted) When Required Requirement Reference Comment DoDI 5000.02 Preliminary Design Review (PDR) Report MS B May be after MS B – requires a Post-PDR Assessment DoDI 5000.02 Post Critical Design Review (CDR) Report Post-CDR Assessment Net-Centric Data Strategy DoDD 8320.02 MS A, B, C Systems Engineering Plan (SEP) DoDI 5000.02 MS A, B, & C IUID Implementation Plan DoDI 5000.02 MS B & C
Enclosure 4, Table 3 Regulatory Requirements Added/Revised For All Programs (unless otherwise noted) When Required Requirement Reference Comment Program Deviation Report DoDI 5000.02 Immediately upon a program deviation APB breaches System Threat Assessment Report (STAR) DoDI 5000.02 DoDD 5105.21 DIA Dir. 5000.200 DIA Inst. 5000.002 MS B & C ACAT I & IA, & all DOT&E Oversight List Programs Systems Threat Assessment (STA) DoDI 5000.02 DoDD 5105.21 DIA Dir. 5000.200 DIA Inst. 5000.002 MS B & C ACAT II Spectrum Supportability Determination DoDD 4650.1 MS B & C Test & Evaluation Strategy (TES) DoDI 5000.02 MS A
Encl 5, IT Considerations, changes • “Title 40/CCA” replaces term CCA. Subtitle III of Title 40, US Code was formerly known as Division E of Clinger-Cohen Act • Table 8 slightly modified for readability • Added: • Investment Review Board (IRB) role as “OIPT” for MAIS and MDAP business systems • Time-Certain Acquisition of IT Business Systems (No MS A approval unless can achieve IOC within 5 years) • Defense Business System Management Committee (DBSMC) Certification approval for business systems with modernization funding over $1 million – prior to any milestone or FRP approval • DoD CIO notification to Congress 60 days before any MDA cancels or significantly reduces size of MAIS fielded or has received MS C approval • Revised: Requirement for DoD CIO certification of CCA compliance eliminated.
Encl 6, Test & Evaluation, changes • PM, in concert with user and test community, must provide safety releases to developmental and operational testers prior to any test using personnel • Systems that provide capabilities for joint missions must be tested in joint operational environment • Embedded instrumentation must be developed to facilitate training, logistics support and combat data collection • Joint Interoperability Test Command (JITC), “regardless of ACAT” will provide interoperability test certification memoranda to J-6 • At test readiness reviews, PM must ensure impact of all deviations and waivers is considered in decision to proceed to next phase of testing
Encl 6, Test & Evaluation, changes Continued • OUSD(AT&L), Dir Systems Software and Engineering will conduct an independent Assessment of Operational Test Readiness (AOTR) for ACAT ID and special interest programs designated by USD(AT&L). CAE will consider AOTR prior to making determination of materiel readiness for IOT&E • OSD T&E Oversight List categories: developmental testing, operational testing or live fire testing. Programs on list designated for OT or live fire testing will be considered same as MDAPs or covered programs and subject to all provisions of Title 10, US Code and DoDI 5000.02 • Force protection equipment (including non-lethal weapons) will be identified as a separate category on OSD T&E Oversight List
Encl 7, Resource Estimation, changes • PMs must use Cost and Software Data Reporting System to report data on contractor costs and resource usage • CARD must reflect program definition achieved during TD phase, be in sync with other program documents, and if PDR is before MS B, the final CARD at MS B must reflect results of the PDR. • Fully burdened cost of delivered energy must be used in trade-off analysis for all tactical systems with end items that create a demand for energy • Following areas of assessment added to AoA: • Alternative ways to improve the energy efficiency of DoD tactical systems consistent with mission and cost effectiveness • Appropriate system training to ensure that training is provided with the system
Encl 8, Human Systems Integration, changes • Mix of military, DoD civilian, and contractor support to operate, maintain and support (including training) system must be determined based on Manpower Mix Criteria and reported in Manpower Estimate • Economic analyses to support workforce mix decisions must use tools that account for all variable and fixed costs, compensation and non-compensation costs, current and deferred benefits, cash and in-kind benefits • Details on Environment, Safety and Occupational Health (ESOH) moved to new encl 12, Systems Engineering
Encl 9, Acquisition of Services, changes • Planning for acquisition of services must consider: • Requirements development and management • Acquisition planning • Solicitation and contract award • Risk management • Contract tracking and oversight • Performance evaluation • Special procedures for IT services that cost over $500M, all services that cost over $1B, and special interest programs designated by ASD(NII), USD(AT&L) or their designees: • Senior officials/decision authorities must be notified prior to issuing final solicitation (briefing or written) • ASD(NII)/DoD CIO notifies USD(AT&L) of any proposed acquisition of IT services over $1B • Review by ASD(NII)/USD(AT&L) initiates review of acquisition strategy – final RFPs cannot be released until approval.
Encl 9, Acquisition of Services, changes Continued… • Policy extended to services acquired after program achieves Full Operational Capability (FOC), if those services were not subject to previous milestones • Policy does not apply to R&D activities, or services that are approved part of an acquisition program managed IAW DoDI 5000.02 • Senior Officials and decision authorities may apply policy to R&D services at their discretion • SAEs are Senior Officials for acquisition of services • USD(AT&L) is Senior Official for acquisition of services for Components outside of military departments – he may delegate decision authority to commanders/ directors of these components • Independent management reviews (Peer Reviews) required for contracts of $1B or more
Encl 9, Acquisition of Services, changes Continued… Acquisition of Services Categories (Table 9) Category Threshold Decision Authority Acquisitions > $1B Any services acquisition with total estimated cost of $1B or more USD(AT&L) or designee IT services with total estimated cost of $500M or more IT Acquisitions > $500M ASD(NII)/DoD CIO or as designated Special Interest Designated by USD(AT&L), ASD(NII)/ DoD CIO, or any Mil Dept Senior Official USD(AT&L) or Senior Officials Services estimated to cost $250M or more Services Category I Senior Officials or as designated Services estimated to cost $10M or more, but less than $250M Senior Officials or as designated Services Category II Services Category III Services estimated to cost more than simplified acq threshold, but less than $10M Senior Officials or as designated All dollars in FY 2006 constant year dollars
Encl 10, Program Management, changes • Requires PMs for ACAT II and other significant non-major programs to be assigned for not less that 3 years. • Program Management Agreements (PMAs) implemented to establish “contract” between PM and acquisition and resource officials • Provides that waivers for PM/PEO experience and certifications “should be strictly avoided.” • Provides for USD(AT&L) waiver for PEO’s to assume other command responsibilities • Adds US-ratified materiel international standardization agreements to consideration for international cooperative programs
Encl 11, Management of Business Systems (New) • Applies to “defense business systems” modernizations with total modernization or development funding exceeding $1 million. • Defines Defense Business System as an information system, other than a national security system, operated by, for, or on behalf of DoD, including financial management systems, mixed systems, financial data feeder systems, and IT and information assurance infrastructure. • Defense Business Systems support activities such as acquisition, financial management, logistics, strategic planning and budgeting, installations and environment, and human resource management.
Encl 11, Management of Business Systems (New), Continued… • Funds cannot be expended until the Defense Business System Management Committee (DBSMC) approves Investment Review Board Certification (IRB) that the system: • Is in compliance with the enterprise architecture; or Is necessary to achieve a critical national security capability or address a critical requirement in an area such as safety or security; or Is necessary to prevent a significant adverse impact on a project that is needed to achieve an essential capability
Encl 11, Management of Business Systems (New), Continued… Business Systems Certification and Approval Process 5 Program Manager (PM) Component Pre-Certification Authority (PCA) Investment Review Board (IRB) Defense Business Systems Management Committee (DBSMC) 1 2 5 3 6 Certification Authority (CA) Milestone Decision Authority (MDA) 4 • PM completes economic viability review & other plans/analysis as requested by the PCA • PCA Validates info from PM, forwards certification request to appropriate IRB • IRB reviews request, IRB chair recommends appropriate approval authority sign certification memo and request DBSMC approval • CA sends signed certification memo to DBSMC for approval • DBSMC Chair approves certification and sends decision to the PM through the PCA. • PM requests MDA conduct milestone review
Encl 12, Systems Engineering (New) • Systems Engineering Plan (SEP) required at each milestone • MDA is approval authority for the SEP • For programs where USD(AT&L) is MDA, and programs on the DT-only portion of OSD T&E Oversight List, SEPs must be submitted to Director, Systems and Software Engineering 30 days prior to DAB/ITAB review • PEOs must have lead systems engineer – oversees SE across PEOs portfolio; reviews SEPs; assesses performance of subordinate systems engineers with PEO and PM • Event-driven technical reviews required – with SMEs independent of program, unless waived by MDA • Requires configuration management to establish and control product attributes and the technical baseline • Spectrum Supportability determination required
Encl 12, Systems Engineering (New) Continued… • ESOH risk management required to be integrated with overall SE process; Programmatic ESOH Evaluation (PESHE) required of all programs regardless of ACAT • NEPA and EO 12114 (Environmental Effects Abroad of Major Federal Actions) analysis required of PM, approved by CAE • Addresses PM support of Mishap Accident Investigations • Requires Corrosion Prevention Control Plan for ACAT I programs at MS B and C • Requires PMs to employ modular open systems approach to design • Data Management Strategy (DMS) required to assess long-term technical data needs of the system – included in Acquisition Strategy
Now for the Acquisition Management System We will “walk through” the process and highlight major changes
FULL- SCALE DEVELOPMENT Full-Scale Development Decision First Acquisition Framework in 1971 CONCEPTUAL EFFORT PRODUCTION/ DEPLOYMENT Program Initiation Production Go-ahead Decision • Decision points: 3 • Phases: 3 • Milestone documents: 1 (Decision Coordinating Paper (DCP))
A The Defense Acquisition Framework 2003 • Process entry at Milestones A, B, or C • Entrance criteria met before entering phases • Evolutionary Acquisition (EA) or Single Step to Full Capability (EA preferred) User Needs & Technology Opportunities B C IOC FOC Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support System Integration System Demonstration LRIP Full-Rate Prod & Deployment Sustainment Disposal FRP Decision Review Design Readiness Review Concept Decision PDR CDR Pre-Systems Acquisition Systems Acquisition Sustainment • Decision points: 6 • Phases: 5 • Milestone documents: 30+
A B The Defense Acquisition Management System 2008 • The Materiel Development Decision precedes • entry into any phase of the acquisition framework • Entrance criteria met before entering phases • Evolutionary Acquisition or Single Step to Full Capability User Needs Technology Opportunities & Resources C IOC FOC Materiel Solution Analysis Technology Development Engineering & Manufacturing Development Production & Deployment Operations & Support Operations & Support Integrated System Design System Capability & Manufacturing Process Demonstration LRIP Full-Rate Prod & Deployment Life Cycle Sustainment FRP Decision Review Materiel Development Decision Disposal Post CDR Assessment Post PDR Assessment PDR PDR CDR or Pre-Systems Acquisition Systems Acquisition Sustainment • Decision points: 6 • Phases: 5 • Milestone documents:40+ New in bold blue italics
DoD Strategic Guidance AoA B B B C C C Evolutionary Approach Joint Operating Concepts Joint Functional Concepts Gap Analysis DAB DAB DAB Materiel SolutionAnalysis Technology Development EMD Increment 1 MDD ICD A CDD1 CPD1 JROC JROC JROC DAB DAB DAB Technology Development EMD Increment 2 CDD2 A CPD2 JROC JROC DAB DAB DAB EMD Increment 3 TechnologyDevelopment CPD3 CDD3 A . . . JROC JROC Continuous Technology Development and Maturation
C A CDD CPD The Defense Acquisition Management System • The Materiel Development Decision precedes entry into any phase of the acquisition management system • Entrance Criteria met before entering phase • Evolutionary Acquisition or Single Step to Full Capability User Needs Technology Opportunities & Resources B IOC FOC Materiel Solution Analysis Technology Development Engineering and Manufacturing Development Production & Deployment Operations & Support ICD Materiel Development Decision FRP Decision Review Post PDR Assessment Post CDR Assessment AoA PDR PDR CDR or Pre-Systems Acquisition Systems Acquisition Sustainment Initial Capabilities Document (ICD) Capability Development Document (CDD) Capability Production Document (CPD) Relationship to JCIDS PDR: Preliminary Design Review CDR: Critical Design Review FRP: Full Rate Production IOC: Initial Operational Capability FOC: Full Operational Capability
Pre-Systems Acquisition A B User Needs Technology Opportunities & Resources MaterielSolutionAnalysis Technology Development Materiel Development Decision • User Need • JCIDS Capabilities-Based Assessment (CBA) • Initial Capabilities Document (ICD) • Technology Opportunities • All sources foreign & domestic • Small Business Innovation Research (SBIR) Program • Technology Projects: JCTDs, Coalition Warfare Program, Defense Acquisition Challenge Program, etc… New terms/requirements in bold blue italics
Materiel Development Decision (MDD) MDA: • Approves AoA Study Guidance • Determines acquisition phase of entry • Identifies initial review milestone • Designates Lead DoD Component • Approves Acquisition Decision Memorandum(ADM) Regulatory Requirements • Initial Capabilities Document (ICD) • AoA Study Guidance(AoA Plan due immediately following the MDD) New terms/requirements in bold blue italics
A Materiel Solution Analysis Materiel Solution Analysis Purpose:Assess potential materiel solutions Materiel Development Decision • Enter:Approved ICD and study guidance for conducting AoA. • Activities:Conduct AoA, develop Technology Development Strategy (TDS) & draft CDD • Guided by:ICD and AoA Plan • Exit: AoA completed, materiel solution options for the capability need identified in ICD have been recommended by lead Component conducting AoA, and phase-specific entrance criteria for the initial review milestone have been satisfied New terms/requirements in bold blue italics
Milestone A Milestone A MDA approves: • Materiel solution • Technology Development Strategy (TDS) • Exit criteria for next phase • Milestone A Certification (10 USC 2366a) • Acquisition Decision Memorandum (ADM) Statutory & Regulatory Requirements • Acquisition Decision Memorandum (ADM) • Analysis of Alternatives (AoA) • Acquisition Information Assurance Strategy • Clinger-Cohen Act (CCA) Compliance • CIO Confirmation of CCA Compliance(for MDAPs & MAIS, DoD CIO confirms) • Consideration of Technology Issues • Component Cost Estimate (CCE) • Economic Analysis (MAIS) • Exit Criteria • Initial Capabilities Document (ICD) • Item Unique Identification (IUID) Implementation Plan • Life Cycle Signature Support Plan • Market Research • MDA Program Certification • Program Protection Plan (PPP) • Systems Engineering Plan (SEP) • Technology Development Strategy (TDS) • Test & Evaluation Strategy (TES) New terms/requirements in bold blue italics
A B Technology Development Purpose:Reduce Technology Risk, determine and mature appropriate set of technologies to be integrated into a full system, and to demonstrate Critical Technology Elements on Prototypes. Technology Development Enter:MDAapproved materiel solutionand TDS; funding for TD phase activities Activities:Competitive prototyping; Develop RAM strategy; conduct Preliminary Design Review (PDR) Guided by:ICD & TDSand supported by SE planning Exit:Affordable increment of military-useful capability identified; technology demonstrated in relevant environment; manufacturing risks identified; system or increment ready for production within short time frame (normally less than 5 yearsfor weapon systems) New terms/requirements in bold blue italics
Milestone B MDA approves: • Program Initiation (for most programs) • Entry intoEMD • Acquisition Strategy • Acquisition Program Baseline • LRIP quantities • Exit criteria for next phase • Type of Contract • Milestone B Certification (10 USC 2366b) • ADM New terms/requirements in bold blue italics