Use of Overbooking in Diffserv-aware MPLS Traffic Engineering <draft-wlai-tewg-overbook-00.txt>

Use of Overbooking in Diffserv-aware MPLS Traffic Engineering <draft-wlai-tewg-overbook-00.txt> IETF’57 TEWG Meeting Vienna, July 14, 2003 Jerry Ash, Wai Sum Lai AT&T Labs. Overbooking in DS-TE Per-domain per-CT overbooking Specified in current PROTO, MAM, and RDM drafts

Download Presentation

Use of Overbooking in Diffserv-aware MPLS Traffic Engineering <draft-wlai-tewg-overbook-00.txt>

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Use of Overbooking in Diffserv-aware MPLS Traffic Engineering <draft-wlai-tewg-overbook-00.txt> IETF’57 TEWG Meeting Vienna, July 14, 2003 Jerry Ash, Wai Sum Lai AT&T Labs

  2. Overbooking in DS-TE • Per-domain per-CT overbooking • Specified in current PROTO, MAM, and RDM drafts • Based on existing techniques for aggregate TE: Link size overbooking LSP size overbooking • Per-link per-CT overbooking • Addressed by this draft • Two methods compared: Components-based approach (based on the LOM) Integrated approach

  3. Components-Based Approach (the LOM Method) New concepts • LOM = local overbooking multiplier • Normalized bandwidth = reserved bandwidth / LOM Bandwidth Constraints • Unaffected by LOM Unreserved Bandwidth • Needs to be adjusted to account for LOM Maximum Reservable Bandwidth • Relationship with LOM currently unspecified Impact on operations • Different formulas for different overbooking scenarios

  4. Integrated Approach Single concept, single formula • Maximum reservable bandwidth = maximum link bandwidth • OB = overbooking factor • OB = LSOM * LSPOM * LOM LSOM = link size overbooking multiplier LSPOM = LSP size overbooking multiplier LOM = local overbooking multiplier Impact on router operations • Reserved bandwidth = Tspec / OB

  5. Integrated Approach Issues under discussion • router interpretation of Tspec to determine ‘reserved bandwidth’ • relationship to current overbooking models • validity of Maximum reservable bandwidth = maximum link bandwidth