1 / 14

The Technical Control Room -T.C.R.-

The Technical Control Room -T.C.R.-. CERN. AB. AC. AS. AT. DSU. EP. EST. AB. ETT. EFI. HR. IT. SPL. ST. TH. TIS. ST-CE. ST-CV. ST-DI. ST-EL. ST-FM. ST-HM. ST-MA. MA-AC. MA-AS. MA-IN. MA-SE. MA-DC. MA-TCR. TCR position at CERN:. TCR organization:.

aiko
Download Presentation

The Technical Control Room -T.C.R.-

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TheTechnical Control Room-T.C.R.-

  2. CERN AB AC AS AT DSU EP EST AB ETT EFI HR IT SPL ST TH TIS ST-CE ST-CV ST-DI ST-EL ST-FM ST-HM ST-MA MA-AC MA-AS MA-IN MA-SE MA-DC MA-TCR TCR position at CERN:

  3. TCR organization: -24/24h - 365 days (3x8) -2 operators by shift -2 teams of operators (15 ops) -2 team leaders -Career path: C (~Bac+2: elec., mecha., comp.,…) -3 + 3 year contracts -age 24 - 33

  4. 1 Section Leaders 15 Operators 2 Team Leaders *9 nationalities

  5. PCR TCR MCR

  6. 72231 Contractors 72201 Monitoring CERN-Groups ~50% First-Line Technical Facilities TCR Services ~50% Accelerator’sTechnical Infrastructure

  7. Electricity HT, MT, BT, Energy Consumption,etc. Safety Fire/Gas, Environment, Emergency Stop, ... Water Pumping Stations, Raw, Prim, Chilled, Demi, ... ControlHardware Front ends, Servers Thermal Air-conditioning, Ventilation, Heating Control Network HP-Open, X-Cluc SPS Vacuum Pumps, Pressures,Control, … Cryogenics Alarms Systems under Control: TCR 24h/day 365days/year Analyse and report Alarm Definitions & Testing IS37 + Note Coup.

  8. Monit.>663000/Year (~1800/day) Phone>100000/Year (~250/Day) TREATMENT CRYO CERN & Contractors Work Requests>10600/Year (~40/Day) TCR Interv.>1750/Year (~5/Day) First-Line (TCR) Others: Tests, Intermitants, Teams at Work,… Quantity of Alarms in TCR (for 2002):

  9. *CRYO = 13 Alarms *All Systems ~ 50000 Alarms =0.026% CRYO ALARM = 0.2% Alarms by System: Alarms in TCR~663000

  10. } Level 0 } Level 1 } Level 2 } Level 3

  11. G.T.P.M. – Project (TCR/MCR-PCR): Read this Way

  12. TCR PCR G.T.P.M. – Project: Read this Way

  13. - THE END -

More Related