An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical control problems Control and Compliance Conference Peterhead 21-22 February 2008 Xavier Vázquez Inspection Unit DG FISH

  2. Problems of general nature, that NS fisheries share with other areas • Specific problems related with the implementation of cod recovery and other effort schemes in the NS area • Specific problems linked to protected areas, particularly concerning the current definition of management areas and the future network of protected areas • Discards and real-time closures

  3. Problems of general nature • Transport of fish • Absence of respect to technical measures, particularly use of attachments to nets • Deficiencies on the systems of control in various MS bordering the NS • Systems of sanctions

  4. Specific problems related with cod recovery • Effort displacement • Effort management • Transfers of effort • Misbalance between effort and quotas • Different interpretation of control rules • Inspection quality

  5. Specific problems related with protected areas • Definition of management and protected areas • Rules of access on each particular case • Future network of Natura 2000 zones

  6. Discards and real-time closures • Future ban on discards: parameters to define progressive measures • Implementation of real-time closures: parameters to implement such closures, proportionality of the measures and non-discriminatory character of the measures

  7. Key ideas • Harmonisation (legal texts, interpretation, standard methodology) • Simplification (rules and procedures, including administrative sanctions) • Better control (less expensive, more focussed) • More control?