1 / 12

Sistema operazionale per il Canton Ticino MODULO Piccoli Bacini

Sistema operazionale per il Canton Ticino MODULO Piccoli Bacini. Results of V. Knechtl. IDF at 200 m resolution for RhiresD and CLEPS Evaluation of RhiresD , CLEPS and RadarQPE Analysis for selected basins Operational implementation for lead time 24h-120h with CLEPS

ailani
Download Presentation

Sistema operazionale per il Canton Ticino MODULO Piccoli Bacini

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sistemaoperazionale per il Canton Ticino MODULO PiccoliBacini

  2. Results of V. Knechtl • IDF at 200 m resolution for RhiresD and CLEPS • Evaluation of RhiresD, CLEPS and RadarQPE • Analysis for selected basins • Operational implementation for lead time 24h-120h with CLEPS • Operational implementation for lead time < 24h -> COMBIPRECIP/COSMO2 • Alerts based on IDF for “Upstream Precipitation” • T1.25,T2,T10 for CPC/COSMO2 • probability T2 for CLEPS • - numerous false alarms in case of verification against discharge in small basins -> Need to ADD some HYDROLOGY

  3. Sub areas and location of stations with 10 min precipitation

  4. COMPARISON of T2 accumulated Precip for 24 h

  5. Evaluation of vs damage data (2010-2011, 45 events)

  6. Evaluation of RadarQPEvs Discharge

  7. Evaluation of RhiresDvs Discharge

  8. Operational implementation CLEPS COSMO-LEPS @ 07.08.2013 00:00 UTC

  9. Operational implementation CPC-COSMO2 COSMO 2 @ 29.07.2013 6:00 UTC

  10. Operational implementation CPC-COSMO2 COMBIPRECIP@ 29.07.2013 10:00 UTC

  11. Operational implementation CPC-COSMO2 WARNINGS CPC @ 29.07.2013 10:00 UTC

  12. OUTLOOK • Publication of V. Knechtl results (Spring 2014) • NHESS (Verification agains damages) • MetApps or other (RhiresD IDF vs CLEPS-IDF) • PhD Student starting 1.10.2013 -> M. Antonetti • FOEN Project “Runoff generation during flash floods” • Continuation of experimental operational deployment, statistical analysis • Addition of hydrological knowledge: • Soil moisture deficit • Interception storage deficit • Runoff generation processes • Rain-on-snow? • - Dialog with EU for visualization

More Related